FHWA NBI 2024 Inspection record Public-domain dataset

PORTER AVENUE

Carrying PORTER AVENUE over HOP BROOK

.1 MI EAST OF ROUTE 63, New Haven, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
49 t Inventory load rating

Bridge Snapshot: PORTER AVENUE

The PORTER AVENUE bridge in New Haven, Connecticut carries PORTER AVENUE over HOP BROOK. It was built in 1940, making it 86 years old today. It was last reconstructed in 2002, extending its service life. The structure is built primarily of concrete and spans 1 section, stretching 16.8 meters (55 feet) end to end. Daily traffic averages 5,900 vehicles, placing it in the moderately-trafficked tier of Connecticut bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 49.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PORTER AVENUE compares

▲ 4.4
Load rating vs Connecticut average (44.9 t)
Top 28%
Higher load rating than 72% of Connecticut bridges
891
Bridges in New Haven · 23 in Poor condition
PORTER AVENUE 49.3 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
76.9 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
13.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
49.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1940
Last Reconstructed
2002
Material
Concrete
Number of Spans
1
Structure Length
16.8 m (55 ft)
Deck Width
13.0 m (43 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
5,900 vehicles/day
Structure Number
04903

Condition Analysis

  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether PORTER AVENUE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PORTER AVENUE against other structures in New Haven and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PORTER AVENUE?

PORTER AVENUE in New Haven, Connecticut, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PORTER AVENUE inspected?

PORTER AVENUE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,900 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PORTER AVENUE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PORTER AVENUE?

PORTER AVENUE has an NBI inventory load rating of 49.3 metric tons.

Who is responsible for maintaining PORTER AVENUE?

PORTER AVENUE is owned and maintained by Town/Township Highway Agency.

How old is PORTER AVENUE and does age affect safety?

PORTER AVENUE was built in 1940, making it 86 years old and last reconstructed in 2002.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.