FHWA NBI 2024 Inspection record Public-domain dataset

PRUDDEN LANE

Carrying PRUDDEN LANE over WEPAWAUG RIVER

0.2 MI W OF ROUTE 121, New Haven, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
33 t Inventory load rating

Bridge Snapshot: PRUDDEN LANE

The PRUDDEN LANE bridge in New Haven, Connecticut carries PRUDDEN LANE over WEPAWAUG RIVER. It was built in 1965, making it 61 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 15.9 meters (52 feet) end to end. Daily traffic averages 936 vehicles, placing it in the lower-traffic tier of Connecticut bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PRUDDEN LANE compares

▼ 12.2
Load rating vs Connecticut average (44.9 t)
Bottom 18%
Lower load rating than 82% of Connecticut bridges
891
Bridges in New Haven · 23 in Poor condition
PRUDDEN LANE 32.7 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
89.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
22.1
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1965
Material
Prestressed Concrete
Number of Spans
1
Structure Length
15.9 m (52 ft)
Deck Width
9.1 m (30 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
936 vehicles/day
Structure Number
04923

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether PRUDDEN LANE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PRUDDEN LANE against other structures in New Haven and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PRUDDEN LANE?

PRUDDEN LANE in New Haven, Connecticut has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PRUDDEN LANE inspected?

PRUDDEN LANE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 936 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PRUDDEN LANE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PRUDDEN LANE?

PRUDDEN LANE has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining PRUDDEN LANE?

PRUDDEN LANE is owned and maintained by Town/Township Highway Agency.

How old is PRUDDEN LANE and does age affect safety?

PRUDDEN LANE was built in 1965, making it 61 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.