FHWA NBI 2024 Inspection record Public-domain dataset

MOREHOUSE HWY #1

Carrying MOREHOUSE HWY #1 over MILL RIVER

AT JCT OF CANTERBURY LANE, Fairfield, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
33 t Inventory load rating

Bridge Snapshot: MOREHOUSE HWY #1

The MOREHOUSE HWY #1 bridge in Fairfield, Connecticut carries MOREHOUSE HWY #1 over MILL RIVER. It was built in 1970, making it 56 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 15.9 meters (52 feet) end to end. Daily traffic averages 1,930 vehicles, placing it in the moderately-trafficked tier of Connecticut bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MOREHOUSE HWY #1 compares

▼ 12.2
Load rating vs Connecticut average (44.9 t)
Bottom 18%
Lower load rating than 82% of Connecticut bridges
840
Bridges in Fairfield · 30 in Poor condition
MOREHOUSE HWY #1 32.7 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
63.2 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
21.6
Essentiality /15
14.6
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Material
Concrete
Number of Spans
3
Structure Length
15.9 m (52 ft)
Deck Width
12.1 m (40 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
1,930 vehicles/day
Structure Number
04954

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) rates poor at 4/9, advanced deterioration that should be prioritized for repair.

How to read this record

MOREHOUSE HWY #1 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare MOREHOUSE HWY #1 against other structures in Fairfield and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MOREHOUSE HWY #1?

MOREHOUSE HWY #1 in Fairfield, Connecticut has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is MOREHOUSE HWY #1 inspected?

MOREHOUSE HWY #1's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,930 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MOREHOUSE HWY #1 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MOREHOUSE HWY #1?

MOREHOUSE HWY #1 has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining MOREHOUSE HWY #1?

MOREHOUSE HWY #1 is owned and maintained by Town/Township Highway Agency.

How old is MOREHOUSE HWY #1 and does age affect safety?

MOREHOUSE HWY #1 was built in 1970, making it 56 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.