FHWA NBI 2024 Inspection record Public-domain dataset

FAP 35

Carrying FAP 35 over PISTOL CREEK

IN ALCOA CITY LIMITS, Blount, Tennessee

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating

Bridge Snapshot: FAP 35

The FAP 35 bridge in Blount, Tennessee carries FAP 35 over PISTOL CREEK. It was built in 1924, making it 102 years old today. It was last reconstructed in 1958, extending its service life. The structure is built primarily of concrete and spans 7 sections, stretching 56.5 meters (185 feet) end to end. Daily traffic averages 15,955 vehicles, placing it in the heavily-trafficked tier of Tennessee bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 26.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FAP 35 compares

▼ 3.3
Load rating vs Tennessee average (29.5 t)
Bottom 26%
Lower load rating than 74% of Tennessee bridges
220
Bridges in Blount · 5 in Poor condition
FAP 35 26.2 t
Tennessee average 29.5 t

Live comparison across Tennessee.

Historical Sufficiency Rating

PlainBridge-computed
62.4 / 100 - historical 50–79.9 band
Structural adequacy /55
40.0
Serviceability /30
10.0
Essentiality /15
12.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
26.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1924
Last Reconstructed
1958
Material
Concrete
Number of Spans
7
Structure Length
56.5 m (185 ft)
Deck Width
11.4 m (37 ft)
Owner
State Highway Agency
Avg Daily Traffic
15,955 vehicles/day
Structure Number
05SR0350004

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether FAP 35 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FAP 35 against other structures in Blount and across Tennessee. Tennessee bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAP 35?

FAP 35 in Blount, Tennessee has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is FAP 35 inspected?

FAP 35's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 15,955 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAP 35 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAP 35?

FAP 35 has an NBI inventory load rating of 26.2 metric tons.

Who is responsible for maintaining FAP 35?

FAP 35 is owned and maintained by State Highway Agency.

How old is FAP 35 and does age affect safety?

FAP 35 was built in 1924, making it 102 years old and last reconstructed in 1958.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.