FHWA NBI 2024 Inspection record Public-domain dataset

WEWAKA BROOK ROAD

Carrying WEWAKA BROOK ROAD over WEWAKA BROOK

1.85M S OF INT RTE133&867, Litchfield, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
58 t Inventory load rating

Bridge Snapshot: WEWAKA BROOK ROAD

The WEWAKA BROOK ROAD bridge in Litchfield, Connecticut carries WEWAKA BROOK ROAD over WEWAKA BROOK. It was built in 1933, making it 93 years old today. The structure is built primarily of concrete and spans 1 section, stretching 7.5 meters (25 feet) end to end. Daily traffic averages 260 vehicles, placing it in the lower-traffic tier of Connecticut bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 58.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How WEWAKA BROOK ROAD compares

▲ 13.4
Load rating vs Connecticut average (44.9 t)
Top 16%
Higher load rating than 84% of Connecticut bridges
466
Bridges in Litchfield · 34 in Poor condition
WEWAKA BROOK ROAD 58.3 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
65.9 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
9.0
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
58.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1933
Material
Concrete
Number of Spans
1
Structure Length
7.5 m (25 ft)
Deck Width
6.4 m (21 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
260 vehicles/day
Structure Number
06128

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether WEWAKA BROOK ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WEWAKA BROOK ROAD against other structures in Litchfield and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WEWAKA BROOK ROAD?

WEWAKA BROOK ROAD in Litchfield, Connecticut has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is WEWAKA BROOK ROAD inspected?

WEWAKA BROOK ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 260 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WEWAKA BROOK ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WEWAKA BROOK ROAD?

WEWAKA BROOK ROAD has an NBI inventory load rating of 58.3 metric tons.

Who is responsible for maintaining WEWAKA BROOK ROAD?

WEWAKA BROOK ROAD is owned and maintained by Town/Township Highway Agency.

How old is WEWAKA BROOK ROAD and does age affect safety?

WEWAKA BROOK ROAD was built in 1933, making it 93 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.