FHWA NBI 2024 Inspection record Public-domain dataset

ROUTE 309

Carrying ROUTE 309 over STRATTON BROOK

0.3 MILE WEST OF RTE. 167, Hartford, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating

Bridge Snapshot: ROUTE 309

The ROUTE 309 bridge in Hartford, Connecticut carries ROUTE 309 over STRATTON BROOK. It was built in 1992, making it 34 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 10.4 meters (34 feet) end to end. Daily traffic averages 3,800 vehicles, placing it in the moderately-trafficked tier of Connecticut bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 25.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ROUTE 309 compares

▼ 19.0
Load rating vs Connecticut average (44.9 t)
Bottom 7%
Lower load rating than 93% of Connecticut bridges
893
Bridges in Hartford · 19 in Poor condition
ROUTE 309 25.9 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
78.9 / 100 - historical 50–79.9 band
Structural adequacy /55
49.6
Serviceability /30
15.5
Essentiality /15
13.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
25.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1992
Material
Prestressed Concrete
Number of Spans
1
Structure Length
10.4 m (34 ft)
Deck Width
10.1 m (33 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,800 vehicles/day
Structure Number
06192

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether ROUTE 309 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ROUTE 309 against other structures in Hartford and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ROUTE 309?

ROUTE 309 in Hartford, Connecticut has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is ROUTE 309 inspected?

ROUTE 309's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,800 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ROUTE 309 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ROUTE 309?

ROUTE 309 has an NBI inventory load rating of 25.9 metric tons.

Who is responsible for maintaining ROUTE 309?

ROUTE 309 is owned and maintained by State Highway Agency.

How old is ROUTE 309 and does age affect safety?

ROUTE 309 was built in 1992, making it 34 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.