FHWA NBI 2024 Inspection record Public-domain dataset

ACCESS ROAD

Carrying ACCESS ROAD over BLACKBERRY RIVER

BY IND.MON.OFF LOWER ROAD, Litchfield, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
6 t Inventory load rating

Bridge Snapshot: ACCESS ROAD

The ACCESS ROAD bridge in Litchfield, Connecticut carries ACCESS ROAD over BLACKBERRY RIVER. It was built in 1970, making it 56 years old today. It was last reconstructed in 2012, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 20.4 meters (67 feet) end to end. Daily traffic averages 15 vehicles, placing it in the lower-traffic tier of Connecticut bridges. It is owned and maintained by State Park/Forest/Reservation.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 6.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ACCESS ROAD compares

▼ 38.6
Load rating vs Connecticut average (44.9 t)
Bottom 1%
Lower load rating than 99% of Connecticut bridges
466
Bridges in Litchfield · 34 in Poor condition
ACCESS ROAD 6.3 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
34.1 / 100 - historical 20–49.9 band
Structural adequacy /55
11.6
Serviceability /30
8.0
Essentiality /15
14.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
6.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Last Reconstructed
2012
Material
Steel
Number of Spans
1
Structure Length
20.4 m (67 ft)
Deck Width
4.2 m (14 ft)
Owner
State Park/Forest/Reservation
Avg Daily Traffic
15 vehicles/day
Structure Number
06382

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether ACCESS ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ACCESS ROAD against other structures in Litchfield and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ACCESS ROAD?

ACCESS ROAD in Litchfield, Connecticut has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is ACCESS ROAD inspected?

ACCESS ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 15 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ACCESS ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ACCESS ROAD?

ACCESS ROAD has an NBI inventory load rating of 6.3 metric tons.

Who is responsible for maintaining ACCESS ROAD?

ACCESS ROAD is owned and maintained by State Park/Forest/Reservation.

How old is ACCESS ROAD and does age affect safety?

ACCESS ROAD was built in 1970, making it 56 years old and last reconstructed in 2012.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.