FHWA NBI 2024 Inspection record Public-domain dataset

CIRILLO DRIVE

Carrying CIRILLO DRIVE over BROOK

325 FT. WEST OF WOODBINE, New London, Connecticut

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
33 t Inventory load rating

Bridge Snapshot: CIRILLO DRIVE

The CIRILLO DRIVE bridge in New London, Connecticut carries CIRILLO DRIVE over BROOK. It was built in 2005, making it 21 years old today. The structure is built primarily of concrete and spans 1 section, stretching 14.6 meters (48 feet) end to end. Daily traffic averages 152 vehicles, placing it in the lower-traffic tier of Connecticut bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CIRILLO DRIVE compares

▼ 12.2
Load rating vs Connecticut average (44.9 t)
Bottom 18%
Lower load rating than 82% of Connecticut bridges
431
Bridges in New London · 16 in Poor condition
CIRILLO DRIVE 32.7 t
Connecticut average 44.9 t

Live comparison across Connecticut.

Historical Sufficiency Rating

PlainBridge-computed
95.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
26.0
Essentiality /15
15.0
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2005
Material
Concrete
Number of Spans
1
Structure Length
14.6 m (48 ft)
Deck Width
11.6 m (38 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
152 vehicles/day
Structure Number
06789

Condition Analysis

  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether CIRILLO DRIVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CIRILLO DRIVE against other structures in New London and across Connecticut. Connecticut bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CIRILLO DRIVE?

CIRILLO DRIVE in New London, Connecticut, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CIRILLO DRIVE inspected?

CIRILLO DRIVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 152 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CIRILLO DRIVE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CIRILLO DRIVE?

CIRILLO DRIVE has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining CIRILLO DRIVE?

CIRILLO DRIVE is owned and maintained by Town/Township Highway Agency.

How old is CIRILLO DRIVE and does age affect safety?

CIRILLO DRIVE was built in 2005, making it 21 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.