FHWA NBI 2024 Inspection record Public-domain dataset

IL 267

Carrying IL 267 over COAL CREEK

3.5M S US 67, Morgan, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
89 t Inventory load rating

Bridge Snapshot: IL 267

The IL 267 bridge in Morgan, Illinois carries IL 267 over COAL CREEK. It was built in 1942, making it 84 years old today. The structure is built primarily of concrete and spans 1 section, stretching 9.9 meters (32 feet) end to end. Daily traffic averages 2,150 vehicles, placing it in the moderately-trafficked tier of Illinois bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 89.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IL 267 compares

▲ 54.5
Load rating vs Illinois average (34.6 t)
Top 1%
Higher load rating than 99% of Illinois bridges
241
Bridges in Morgan · 18 in Poor condition
IL 267 89.1 t
Illinois average 34.6 t

Live comparison across Illinois.

Historical Sufficiency Rating

PlainBridge-computed
96.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
12.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
89.1 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1942
Material
Concrete
Number of Spans
1
Structure Length
9.9 m (32 ft)
Deck Width
23.5 m (77 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,150 vehicles/day
Structure Number
069002600000000

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether IL 267 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IL 267 against other structures in Morgan and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IL 267?

IL 267 in Morgan, Illinois has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is IL 267 inspected?

IL 267's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,150 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IL 267 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IL 267?

IL 267 has an NBI inventory load rating of 89.1 metric tons.

Who is responsible for maintaining IL 267?

IL 267 is owned and maintained by State Highway Agency.

How old is IL 267 and does age affect safety?

IL 267 was built in 1942, making it 84 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.