INDUSTRIAL PARK RO
Carrying INDUSTRIAL PARK RO over GAGES BROOK
0.2 MILE SOUTH OF RTE 30, Tolland, Connecticut
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: INDUSTRIAL PARK RO
The INDUSTRIAL PARK RO bridge in Tolland, Connecticut carries INDUSTRIAL PARK RO over GAGES BROOK. It was built in 1980, making it 46 years old today. The structure is built primarily of steel and spans 3 sections, stretching 7.3 meters (24 feet) end to end. Daily traffic averages 105 vehicles, placing it in the lower-traffic tier of Connecticut bridges. It is owned and maintained by Town/Township Highway Agency.
The latest FHWA inspection records show culvert at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 53.5 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How INDUSTRIAL PARK RO compares
Live comparison across Connecticut.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1980
- Material
- Steel
- Number of Spans
- 3
- Structure Length
- 7.3 m (24 ft)
- Owner
- Town/Township Highway Agency
- Avg Daily Traffic
- 105 vehicles/day
- Structure Number
- 06975
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
INDUSTRIAL PARK RO is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare INDUSTRIAL PARK RO against other structures in Tolland and across Connecticut. Connecticut bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for INDUSTRIAL PARK RO?
INDUSTRIAL PARK RO in Tolland, Connecticut on the FHWA's 0–9 scale.
How often is INDUSTRIAL PARK RO inspected?
INDUSTRIAL PARK RO's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 105 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. INDUSTRIAL PARK RO is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for INDUSTRIAL PARK RO?
INDUSTRIAL PARK RO has an NBI inventory load rating of 53.5 metric tons.
Who is responsible for maintaining INDUSTRIAL PARK RO?
INDUSTRIAL PARK RO is owned and maintained by Town/Township Highway Agency.
How old is INDUSTRIAL PARK RO and does age affect safety?
INDUSTRIAL PARK RO was built in 1980, making it 46 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.