FHWA NBI 2024 Inspection record Public-domain dataset

DICKEY ROAD

Carrying DICKEY ROAD over INDIANA HARBOR CANAL

00.50 NE MICHIGAN ST, Lake, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
24 t Inventory load rating

Bridge Snapshot: DICKEY ROAD

The DICKEY ROAD bridge in Lake, Indiana carries DICKEY ROAD over INDIANA HARBOR CANAL. It was built in 1992, making it 34 years old today. The structure is built primarily of steel and spans 1 section, stretching 118.0 meters (387 feet) end to end. Daily traffic averages 21,854 vehicles, placing it in the heavily-trafficked tier of Indiana bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 24.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How DICKEY ROAD compares

▼ 11.2
Load rating vs Indiana average (35.6 t)
Bottom 11%
Lower load rating than 89% of Indiana bridges
488
Bridges in Lake · 27 in Poor condition
DICKEY ROAD 24.4 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
63.3 / 100 - historical 50–79.9 band
Structural adequacy /55
47.6
Serviceability /30
13.0
Essentiality /15
10.7
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
24.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1992
Material
Steel
Number of Spans
1
Structure Length
118.0 m (387 ft)
Deck Width
19.7 m (65 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
21,854 vehicles/day
Structure Number
0800000

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether DICKEY ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare DICKEY ROAD against other structures in Lake and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for DICKEY ROAD?

DICKEY ROAD in Lake, Indiana has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is DICKEY ROAD inspected?

DICKEY ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 21,854 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. DICKEY ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for DICKEY ROAD?

DICKEY ROAD has an NBI inventory load rating of 24.4 metric tons.

Who is responsible for maintaining DICKEY ROAD?

DICKEY ROAD is owned and maintained by City/Municipal Highway Agency.

How old is DICKEY ROAD and does age affect safety?

DICKEY ROAD was built in 1992, making it 34 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.