FHWA NBI 2024 Inspection record Public-domain dataset

FSR 200

Carrying FSR 200 over UNNAMED STREAM

1.75 MI WEST OF STATE 250, Baker, Florida

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
13 t Inventory load rating

Bridge Snapshot: FSR 200

The FSR 200 bridge in Baker, Florida carries FSR 200 over UNNAMED STREAM. It was built in 1976, making it 50 years old today. The structure is built primarily of steel continuous and spans 1 section, stretching 9.8 meters (32 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Florida bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 12.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FSR 200 compares

▼ 26.3
Load rating vs Florida average (38.9 t)
Bottom 2%
Lower load rating than 98% of Florida bridges
93
Bridges in Baker · 8 in Poor condition
FSR 200 12.6 t
Florida average 38.9 t

Live comparison across Florida.

Historical Sufficiency Rating

PlainBridge-computed
15.9 / 100 - historical under-20 band
Structural adequacy /55
1.3
Serviceability /30
13.3
Essentiality /15
1.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
12.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1976
Material
Steel Continuous
Number of Spans
1
Structure Length
9.8 m (32 ft)
Deck Width
5.2 m (17 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
50 vehicles/day
Structure Number
080504000029135

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

FSR 200 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare FSR 200 against other structures in Baker and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FSR 200?

FSR 200 in Baker, Florida has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is FSR 200 inspected?

FSR 200's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FSR 200 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FSR 200?

FSR 200 has an NBI inventory load rating of 12.6 metric tons.

Who is responsible for maintaining FSR 200?

FSR 200 is owned and maintained by U.S. Forest Service.

How old is FSR 200 and does age affect safety?

FSR 200 was built in 1976, making it 50 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.