FHWA NBI 2024 Inspection record Public-domain dataset

Kirby-Mayview Road

Carrying Kirby-Mayview Road over CASEY CREEK

SNAKE RIVER, Garfield, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating

Bridge Snapshot: Kirby-Mayview Road

The Kirby-Mayview Road bridge in Garfield, Washington carries Kirby-Mayview Road over CASEY CREEK. It was built in 1979, making it 47 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 12.2 meters (40 feet) end to end. Daily traffic averages 350 vehicles, placing it in the lower-traffic tier of Washington bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 26.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Kirby-Mayview Road compares

▼ 7.3
Load rating vs Washington average (33.5 t)
Bottom 37%
Lower load rating than 63% of Washington bridges
54
Bridges in Garfield · 4 in Poor condition
Kirby-Mayview Road 26.2 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
89.0 / 100 - historical 80–100 band
Structural adequacy /55
50.0
Serviceability /30
29.0
Essentiality /15
13.5
Special reductions
−3.5

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
26.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1979
Material
Prestressed Concrete
Number of Spans
1
Structure Length
12.2 m (40 ft)
Deck Width
9.8 m (32 ft)
Owner
County Highway Agency
Avg Daily Traffic
350 vehicles/day
Structure Number
083165000000000

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether Kirby-Mayview Road is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Kirby-Mayview Road against other structures in Garfield and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Kirby-Mayview Road?

Kirby-Mayview Road in Garfield, Washington has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is Kirby-Mayview Road inspected?

Kirby-Mayview Road's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 350 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Kirby-Mayview Road is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Kirby-Mayview Road?

Kirby-Mayview Road has an NBI inventory load rating of 26.2 metric tons.

Who is responsible for maintaining Kirby-Mayview Road?

Kirby-Mayview Road is owned and maintained by County Highway Agency.

How old is Kirby-Mayview Road and does age affect safety?

Kirby-Mayview Road was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.