FHWA NBI 2024 Inspection record Public-domain dataset

FAS 436

Carrying FAS 436 over OVERFLOW

3.6 MI S JCT SR76&SR22, Carroll, Tennessee

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
39 t Inventory load rating

Bridge Snapshot: FAS 436

The FAS 436 bridge in Carroll, Tennessee carries FAS 436 over OVERFLOW. It was built in 2012, making it 14 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 30.2 meters (99 feet) end to end. Daily traffic averages 1,461 vehicles, placing it in the moderately-trafficked tier of Tennessee bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 38.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FAS 436 compares

▲ 9.1
Load rating vs Tennessee average (29.5 t)
Top 3%
Higher load rating than 97% of Tennessee bridges
240
Bridges in Carroll · 5 in Poor condition
FAS 436 38.6 t
Tennessee average 29.5 t

Live comparison across Tennessee.

Historical Sufficiency Rating

PlainBridge-computed
93.2 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
24.6
Essentiality /15
13.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
38.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2012
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
30.2 m (99 ft)
Deck Width
9.5 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,461 vehicles/day
Structure Number
09S82330013

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether FAS 436 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FAS 436 against other structures in Carroll and across Tennessee. Tennessee bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAS 436?

FAS 436 in Carroll, Tennessee has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FAS 436 inspected?

FAS 436's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,461 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAS 436 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAS 436?

FAS 436 has an NBI inventory load rating of 38.6 metric tons.

Who is responsible for maintaining FAS 436?

FAS 436 is owned and maintained by State Highway Agency.

How old is FAS 436 and does age affect safety?

FAS 436 was built in 2012, making it 14 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.