FHWA NBI 2024 Inspection record Public-domain dataset

2050000

Carrying 2050000 over PERM

STANEY, Prince of Wales-Hyder, Alaska

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
42 t Inventory load rating

Bridge Snapshot: 2050000

The 2050000 bridge in Prince of Wales-Hyder, Alaska carries 2050000 over PERM. It was built in 1989, making it 37 years old today. The structure is built primarily of wood or timber and spans 2 sections, stretching 40.5 meters (133 feet) end to end. Daily traffic averages 10 vehicles, placing it in the lower-traffic tier of Alaska bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 42.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How 2050000 compares

▲ 7.6
Load rating vs Alaska average (34.8 t)
Top 26%
Higher load rating than 74% of Alaska bridges
185
Bridges in Prince of Wales-Hyder · 14 in Poor condition
2050000 42.4 t
Alaska average 34.8 t

Live comparison across Alaska.

Historical Sufficiency Rating

PlainBridge-computed
80.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
18.5
Essentiality /15
14.9
Special reductions
−7.9

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
42.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1989
Material
Wood or Timber
Number of Spans
2
Structure Length
40.5 m (133 ft)
Deck Width
5.4 m (18 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
10 vehicles/day
Structure Number
100540000001026

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether 2050000 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 2050000 against other structures in Prince of Wales-Hyder and across Alaska. Alaska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 2050000?

2050000 in Prince of Wales-Hyder, Alaska has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is 2050000 inspected?

2050000's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 2050000 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 2050000?

2050000 has an NBI inventory load rating of 42.4 metric tons.

Who is responsible for maintaining 2050000?

2050000 is owned and maintained by U.S. Forest Service.

How old is 2050000 and does age affect safety?

2050000 was built in 1989, making it 37 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.