FHWA NBI 2024 Inspection record Public-domain dataset

3015200-0.525

Carrying 3015200-0.525 over STREAM

THORNE BAY, Prince of Wales-Hyder, Alaska

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
22 t Inventory load rating

Bridge Snapshot: 3015200-0.525

The 3015200-0.525 bridge in Prince of Wales-Hyder, Alaska carries 3015200-0.525 over STREAM. It was built in 1980, making it 46 years old today. It was last reconstructed in 2017, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 18.3 meters (60 feet) end to end. Daily traffic averages 5 vehicles, placing it in the lower-traffic tier of Alaska bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 22.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How 3015200-0.525 compares

▼ 12.4
Load rating vs Alaska average (34.8 t)
Bottom 26%
Lower load rating than 74% of Alaska bridges
185
Bridges in Prince of Wales-Hyder · 14 in Poor condition
3015200-0.525 22.4 t
Alaska average 34.8 t

Live comparison across Alaska.

Historical Sufficiency Rating

PlainBridge-computed
70.2 / 100 - historical 50–79.9 band
Structural adequacy /55
44.7
Serviceability /30
18.5
Essentiality /15
15.0
Special reductions
−7.9

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
22.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1980
Last Reconstructed
2017
Material
Steel
Number of Spans
1
Structure Length
18.3 m (60 ft)
Deck Width
5.5 m (18 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
5 vehicles/day
Structure Number
100540000001178

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether 3015200-0.525 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 3015200-0.525 against other structures in Prince of Wales-Hyder and across Alaska. Alaska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 3015200-0.525?

3015200-0.525 in Prince of Wales-Hyder, Alaska has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is 3015200-0.525 inspected?

3015200-0.525's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 3015200-0.525 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 3015200-0.525?

3015200-0.525 has an NBI inventory load rating of 22.4 metric tons.

Who is responsible for maintaining 3015200-0.525?

3015200-0.525 is owned and maintained by U.S. Forest Service.

How old is 3015200-0.525 and does age affect safety?

3015200-0.525 was built in 1980, making it 46 years old and last reconstructed in 2017.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.