FHWA NBI 2024 Inspection record Public-domain dataset

CR 830 EAST

Carrying CR 830 EAST over SOUTH FORK WILDCAT CREEK

0.50 S OF CR 200 N, Clinton, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
25 t Inventory load rating

Bridge Snapshot: CR 830 EAST

The CR 830 EAST bridge in Clinton, Indiana carries CR 830 EAST over SOUTH FORK WILDCAT CREEK. It was built in 1923, making it 103 years old today. The structure is built primarily of steel and spans 1 section, stretching 7.5 meters (25 feet) end to end. Daily traffic averages 204 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 24.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR 830 EAST compares

▼ 11.1
Load rating vs Indiana average (35.6 t)
Bottom 11%
Lower load rating than 89% of Indiana bridges
205
Bridges in Clinton · 11 in Poor condition
CR 830 EAST 24.5 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
47.1 / 100 - historical 20–49.9 band
Structural adequacy /55
22.8
Serviceability /30
9.5
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1923
Material
Steel
Number of Spans
1
Structure Length
7.5 m (25 ft)
Deck Width
5.0 m (16 ft)
Owner
County Highway Agency
Avg Daily Traffic
204 vehicles/day
Structure Number
1200095

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

CR 830 EAST is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CR 830 EAST against other structures in Clinton and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR 830 EAST?

CR 830 EAST in Clinton, Indiana has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is CR 830 EAST inspected?

CR 830 EAST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 204 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR 830 EAST is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR 830 EAST?

CR 830 EAST has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining CR 830 EAST?

CR 830 EAST is owned and maintained by County Highway Agency.

How old is CR 830 EAST and does age affect safety?

CR 830 EAST was built in 1923, making it 103 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.