FHWA NBI 2024 Inspection record Public-domain dataset

HAMILTON

Carrying HAMILTON over METROLINK

S 1201 T 45 N R 6 E, St. Louis city, Missouri

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
22 t Inventory load rating

Bridge Snapshot: HAMILTON

The HAMILTON bridge in St. Louis city, Missouri carries HAMILTON over METROLINK. It was built in 1936, making it 90 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 27.4 meters (90 feet) end to end. Daily traffic averages 1,300 vehicles, placing it in the moderately-trafficked tier of Missouri bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 3/9, substructure at 3/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 21.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HAMILTON compares

▼ 12.1
Load rating vs Missouri average (33.7 t)
Bottom 23%
Lower load rating than 77% of Missouri bridges
240
Bridges in St. Louis city · 20 in Poor condition
HAMILTON 21.6 t
Missouri average 33.7 t

Live comparison across Missouri.

Historical Sufficiency Rating

PlainBridge-computed
35.2 / 100 - historical 20–49.9 band
Structural adequacy /55
3.5
Serviceability /30
17.0
Essentiality /15
14.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
3/9
Poor (1–4)
Substructure
3/9
Poor (1–4)
Inventory Load Rating
21.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1936
Material
Concrete Continuous
Number of Spans
3
Structure Length
27.4 m (90 ft)
Deck Width
17.7 m (58 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,300 vehicles/day
Structure Number
12949

Condition Analysis

  • The deck (driving surface) rates poor at 3/9, advanced deterioration that should be prioritized for repair.
  • The superstructure (beams and supports above the deck) is in poor condition (3/9), showing advanced deterioration that may require priority repair.
  • At 3/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

HAMILTON is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare HAMILTON against other structures in St. Louis city and across Missouri. Missouri bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HAMILTON?

HAMILTON in St. Louis city, Missouri has a deck rating of 3/9, superstructure rating of 3/9, and substructure rating of 3/9 on the FHWA's 0–9 scale.

How often is HAMILTON inspected?

HAMILTON's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HAMILTON is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HAMILTON?

HAMILTON has an NBI inventory load rating of 21.6 metric tons.

Who is responsible for maintaining HAMILTON?

HAMILTON is owned and maintained by County Highway Agency.

How old is HAMILTON and does age affect safety?

HAMILTON was built in 1936, making it 90 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.