FHWA NBI 2024 Inspection record Public-domain dataset

COUNCIL RD.

Carrying COUNCIL RD. over N. CANADIAN RIVER

0.6 MI S OF RENO, Oklahoma, Oklahoma

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
21 t Inventory load rating

Bridge Snapshot: COUNCIL RD.

The COUNCIL RD. bridge in Oklahoma, Oklahoma carries COUNCIL RD. over N. CANADIAN RIVER. It was built in 1975, making it 51 years old today. It was last reconstructed in 1999, extending its service life. The structure is built primarily of prestressed concrete and spans 6 sections, stretching 183.8 meters (603 feet) end to end. Daily traffic averages 15,620 vehicles, placing it in the heavily-trafficked tier of Oklahoma bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 20.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How COUNCIL RD. compares

▼ 11.7
Load rating vs Oklahoma average (32.4 t)
Bottom 25%
Lower load rating than 75% of Oklahoma bridges
1,216
Bridges in Oklahoma · 68 in Poor condition
COUNCIL RD. 20.7 t
Oklahoma average 32.4 t

Live comparison across Oklahoma.

Historical Sufficiency Rating

PlainBridge-computed
54.0 / 100 - historical 50–79.9 band
Structural adequacy /55
42.0
Serviceability /30
12.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
20.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1975
Last Reconstructed
1999
Material
Prestressed Concrete
Number of Spans
6
Structure Length
183.8 m (603 ft)
Deck Width
18.4 m (60 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
15,620 vehicles/day
Structure Number
191050000000000

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether COUNCIL RD. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare COUNCIL RD. against other structures in Oklahoma and across Oklahoma. Oklahoma bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for COUNCIL RD.?

COUNCIL RD. in Oklahoma, Oklahoma has a deck rating of 8/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is COUNCIL RD. inspected?

COUNCIL RD.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 15,620 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. COUNCIL RD. is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for COUNCIL RD.?

COUNCIL RD. has an NBI inventory load rating of 20.7 metric tons.

Who is responsible for maintaining COUNCIL RD.?

COUNCIL RD. is owned and maintained by City/Municipal Highway Agency.

How old is COUNCIL RD. and does age affect safety?

COUNCIL RD. was built in 1975, making it 51 years old and last reconstructed in 1999.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.