FHWA NBI 2024 Inspection record Public-domain dataset

Pioneer Parkway

Carrying Pioneer Parkway over SCS Channel #6

Near Pioneer PK & U St., Lane, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
29 t Inventory load rating

Bridge Snapshot: Pioneer Parkway

The Pioneer Parkway bridge in Lane, Oregon carries Pioneer Parkway over SCS Channel #6. It was built in 2009, making it 17 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 10.8 meters (35 feet) end to end. Daily traffic averages 140 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 29.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Pioneer Parkway compares

▼ 3.1
Load rating vs Oregon average (32.3 t)
Bottom 48%
Lower load rating than 52% of Oregon bridges
1,010
Bridges in Lane · 13 in Poor condition
Pioneer Parkway 29.2 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
78.1 / 100 - historical 50–79.9 band
Structural adequacy /55
53.1
Serviceability /30
11.0
Essentiality /15
15.0
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
29.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2009
Material
Prestressed Concrete
Number of Spans
1
Structure Length
10.8 m (35 ft)
Deck Width
3.7 m (12 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
140 vehicles/day
Structure Number
21110 000 00000

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether Pioneer Parkway is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Pioneer Parkway against other structures in Lane and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Pioneer Parkway?

Pioneer Parkway in Lane, Oregon has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is Pioneer Parkway inspected?

Pioneer Parkway's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 140 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Pioneer Parkway is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Pioneer Parkway?

Pioneer Parkway has an NBI inventory load rating of 29.2 metric tons.

Who is responsible for maintaining Pioneer Parkway?

Pioneer Parkway is owned and maintained by City/Municipal Highway Agency.

How old is Pioneer Parkway and does age affect safety?

Pioneer Parkway was built in 2009, making it 17 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.