FHWA NBI 2024 Inspection record Public-domain dataset

PUBLIC ROAD

Carrying PUBLIC ROAD over MCKENZIE RIVER

3.0 MI W OF MCKENZIE BR, Lane, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
19 t Inventory load rating

Bridge Snapshot: PUBLIC ROAD

The PUBLIC ROAD bridge in Lane, Oregon carries PUBLIC ROAD over MCKENZIE RIVER. It was built in 2012, making it 14 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 34.8 meters (114 feet) end to end. Daily traffic averages 109 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by Other Local Agencies.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 18.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PUBLIC ROAD compares

▼ 13.8
Load rating vs Oregon average (32.3 t)
Bottom 15%
Lower load rating than 85% of Oregon bridges
1,010
Bridges in Lane · 13 in Poor condition
PUBLIC ROAD 18.5 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
43.9 / 100 - historical 20–49.9 band
Structural adequacy /55
28.1
Serviceability /30
10.0
Essentiality /15
12.7
Special reductions
−7.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
18.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2012
Material
Prestressed Concrete
Number of Spans
1
Structure Length
34.8 m (114 ft)
Deck Width
4.9 m (16 ft)
Owner
Other Local Agencies
Avg Daily Traffic
109 vehicles/day
Structure Number
21933 000000003

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether PUBLIC ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PUBLIC ROAD against other structures in Lane and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PUBLIC ROAD?

PUBLIC ROAD in Lane, Oregon has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is PUBLIC ROAD inspected?

PUBLIC ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 109 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PUBLIC ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PUBLIC ROAD?

PUBLIC ROAD has an NBI inventory load rating of 18.5 metric tons.

Who is responsible for maintaining PUBLIC ROAD?

PUBLIC ROAD is owned and maintained by Other Local Agencies.

How old is PUBLIC ROAD and does age affect safety?

PUBLIC ROAD was built in 2012, making it 14 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.