FHWA NBI 2024 Inspection record Public-domain dataset

HWY 069

Carrying HWY 069 over I-5 (HWY 001)

MP 12.76, Lane, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
53 t Inventory load rating

Bridge Snapshot: HWY 069

The HWY 069 bridge in Lane, Oregon carries HWY 069 over I-5 (HWY 001). It was built in 2017, making it 9 years old today. The structure is built primarily of prestressed concrete continuous and spans 2 sections, stretching 81.7 meters (268 feet) end to end. Daily traffic averages 16,534 vehicles, placing it in the heavily-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 52.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HWY 069 compares

▲ 20.2
Load rating vs Oregon average (32.3 t)
Top 9%
Higher load rating than 91% of Oregon bridges
1,010
Bridges in Lane · 13 in Poor condition
HWY 069 52.5 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
77.0 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
27.0
Essentiality /15
0.0
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
52.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2017
Material
Prestressed Concrete Continuous
Number of Spans
2
Structure Length
81.7 m (268 ft)
Deck Width
9.5 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
16,534 vehicles/day
Structure Number
22125 069 01276

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether HWY 069 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HWY 069 against other structures in Lane and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY 069?

HWY 069 in Lane, Oregon has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is HWY 069 inspected?

HWY 069's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 16,534 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY 069 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY 069?

HWY 069 has an NBI inventory load rating of 52.5 metric tons.

Who is responsible for maintaining HWY 069?

HWY 069 is owned and maintained by State Highway Agency.

How old is HWY 069 and does age affect safety?

HWY 069 was built in 2017, making it 9 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.