FHWA NBI 2024 Inspection record Public-domain dataset

CHICKASAW TP

Carrying CHICKASAW TP over COCHRAN CREEK

5.89 MI NE OF SH 7, Murray, Oklahoma

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
25 t Inventory load rating

Bridge Snapshot: CHICKASAW TP

The CHICKASAW TP bridge in Murray, Oklahoma carries CHICKASAW TP over COCHRAN CREEK. It was built in 1991, making it 35 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 30.8 meters (101 feet) end to end. Daily traffic averages 2,500 vehicles, placing it in the moderately-trafficked tier of Oklahoma bridges. It is owned and maintained by State Toll Authority.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 25.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CHICKASAW TP compares

▼ 7.0
Load rating vs Oklahoma average (32.4 t)
Bottom 34%
Lower load rating than 66% of Oklahoma bridges
128
Bridges in Murray · 3 in Poor condition
CHICKASAW TP 25.4 t
Oklahoma average 32.4 t

Live comparison across Oklahoma.

Historical Sufficiency Rating

PlainBridge-computed
92.6 / 100 - historical 80–100 band
Structural adequacy /55
49.0
Serviceability /30
30.0
Essentiality /15
13.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
25.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1991
Material
Prestressed Concrete
Number of Spans
1
Structure Length
30.8 m (101 ft)
Deck Width
14.0 m (46 ft)
Owner
State Toll Authority
Avg Daily Traffic
2,500 vehicles/day
Structure Number
228380000000000

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether CHICKASAW TP is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CHICKASAW TP against other structures in Murray and across Oklahoma. Oklahoma bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CHICKASAW TP?

CHICKASAW TP in Murray, Oklahoma has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is CHICKASAW TP inspected?

CHICKASAW TP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CHICKASAW TP is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CHICKASAW TP?

CHICKASAW TP has an NBI inventory load rating of 25.4 metric tons.

Who is responsible for maintaining CHICKASAW TP?

CHICKASAW TP is owned and maintained by State Toll Authority.

How old is CHICKASAW TP and does age affect safety?

CHICKASAW TP was built in 1991, making it 35 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.