FHWA NBI 2024 Inspection record Public-domain dataset

CR 500N

Carrying CR 500N over BLACK CREEK

01.36 E SR 5, Grant, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
39 t Inventory load rating

Bridge Snapshot: CR 500N

The CR 500N bridge in Grant, Indiana carries CR 500N over BLACK CREEK. It was built in 1985, making it 41 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 19.6 meters (64 feet) end to end. Daily traffic averages 260 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 39.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR 500N compares

▲ 3.6
Load rating vs Indiana average (35.6 t)
Top 27%
Higher load rating than 73% of Indiana bridges
278
Bridges in Grant · 5 in Poor condition
CR 500N 39.2 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
86.3 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
16.3
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
39.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1985
Material
Prestressed Concrete
Number of Spans
3
Structure Length
19.6 m (64 ft)
Deck Width
7.6 m (25 ft)
Owner
County Highway Agency
Avg Daily Traffic
260 vehicles/day
Structure Number
2700035

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether CR 500N is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CR 500N against other structures in Grant and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR 500N?

CR 500N in Grant, Indiana has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CR 500N inspected?

CR 500N's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 260 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR 500N is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR 500N?

CR 500N has an NBI inventory load rating of 39.2 metric tons.

Who is responsible for maintaining CR 500N?

CR 500N is owned and maintained by County Highway Agency.

How old is CR 500N and does age affect safety?

CR 500N was built in 1985, making it 41 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.