FHWA NBI 2024 Inspection record Public-domain dataset

CR 1100 S

Carrying CR 1100 S over DEER CREEK

02.33 E SR 37, Grant, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
21 t Inventory load rating

Bridge Snapshot: CR 1100 S

The CR 1100 S bridge in Grant, Indiana carries CR 1100 S over DEER CREEK. It was built in 1976, making it 50 years old today. The structure is built primarily of steel and spans 1 section, stretching 7.8 meters (26 feet) end to end. Daily traffic averages 160 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 20.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR 1100 S compares

▼ 14.8
Load rating vs Indiana average (35.6 t)
Bottom 7%
Lower load rating than 93% of Indiana bridges
278
Bridges in Grant · 5 in Poor condition
CR 1100 S 20.8 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
42.3 / 100 - historical 20–49.9 band
Structural adequacy /55
17.1
Serviceability /30
10.3
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
20.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1976
Material
Steel
Number of Spans
1
Structure Length
7.8 m (26 ft)
Deck Width
7.4 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
160 vehicles/day
Structure Number
2700098

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates poor at 4/9, advanced deterioration that should be prioritized for repair.

How to read this record

CR 1100 S is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CR 1100 S against other structures in Grant and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR 1100 S?

CR 1100 S in Grant, Indiana has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is CR 1100 S inspected?

CR 1100 S's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 160 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR 1100 S is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR 1100 S?

CR 1100 S has an NBI inventory load rating of 20.8 metric tons.

Who is responsible for maintaining CR 1100 S?

CR 1100 S is owned and maintained by County Highway Agency.

How old is CR 1100 S and does age affect safety?

CR 1100 S was built in 1976, making it 50 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.