FHWA NBI 2024 Inspection record Public-domain dataset

MEADOW WAY

Carrying MEADOW WAY over SAN ANSELMO CREEK

0.1 MI SE OF CASCADE DR, Marin, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
13 t Inventory load rating

Bridge Snapshot: MEADOW WAY

The MEADOW WAY bridge in Marin, California carries MEADOW WAY over SAN ANSELMO CREEK. It was built in 1950, making it 76 years old today. The structure is built primarily of steel and spans 2 sections, stretching 21.3 meters (70 feet) end to end. Daily traffic averages 55 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 13.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MEADOW WAY compares

▼ 18.0
Load rating vs California average (31.3 t)
Bottom 2%
Lower load rating than 98% of California bridges
217
Bridges in Marin · 18 in Poor condition
MEADOW WAY 13.3 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
17.3 / 100 - historical under-20 band
Structural adequacy /55
2.8
Serviceability /30
5.0
Essentiality /15
9.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
13.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1950
Material
Steel
Number of Spans
2
Structure Length
21.3 m (70 ft)
Deck Width
4.3 m (14 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
55 vehicles/day
Structure Number
27C0008

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

MEADOW WAY is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare MEADOW WAY against other structures in Marin and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MEADOW WAY?

MEADOW WAY in Marin, California has a deck rating of 5/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is MEADOW WAY inspected?

MEADOW WAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 55 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MEADOW WAY is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MEADOW WAY?

MEADOW WAY has an NBI inventory load rating of 13.3 metric tons.

Who is responsible for maintaining MEADOW WAY?

MEADOW WAY is owned and maintained by City/Municipal Highway Agency.

How old is MEADOW WAY and does age affect safety?

MEADOW WAY was built in 1950, making it 76 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.