FHWA NBI 2024 Inspection record Public-domain dataset

ITALIAN BAR RD

Carrying ITALIAN BAR RD over ROSE CREEK

10.7 MI NE BIG HILL ROAD, Tuolumne, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
16 t Inventory load rating

Bridge Snapshot: ITALIAN BAR RD

The ITALIAN BAR RD bridge in Tuolumne, California carries ITALIAN BAR RD over ROSE CREEK. It was built in 1925, making it 101 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 10.4 meters (34 feet) end to end. Daily traffic averages 20 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 15.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ITALIAN BAR RD compares

▼ 15.7
Load rating vs California average (31.3 t)
Bottom 3%
Lower load rating than 97% of California bridges
128
Bridges in Tuolumne · 9 in Poor condition
ITALIAN BAR RD 15.6 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
33.8 / 100 - historical 20–49.9 band
Structural adequacy /55
7.6
Serviceability /30
11.5
Essentiality /15
14.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
15.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1925
Material
Concrete Continuous
Number of Spans
2
Structure Length
10.4 m (34 ft)
Deck Width
5.3 m (17 ft)
Owner
County Highway Agency
Avg Daily Traffic
20 vehicles/day
Structure Number
32C0037

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

ITALIAN BAR RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare ITALIAN BAR RD against other structures in Tuolumne and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ITALIAN BAR RD?

ITALIAN BAR RD in Tuolumne, California has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is ITALIAN BAR RD inspected?

ITALIAN BAR RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ITALIAN BAR RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ITALIAN BAR RD?

ITALIAN BAR RD has an NBI inventory load rating of 15.6 metric tons.

Who is responsible for maintaining ITALIAN BAR RD?

ITALIAN BAR RD is owned and maintained by County Highway Agency.

How old is ITALIAN BAR RD and does age affect safety?

ITALIAN BAR RD was built in 1925, making it 101 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.