FHWA NBI 2024 Inspection record Public-domain dataset

MONO WAY

Carrying MONO WAY over SULLIVAN CREEK

0.5 MI E OF HWY 108, Tuolumne, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
32 t Inventory load rating

Bridge Snapshot: MONO WAY

The MONO WAY bridge in Tuolumne, California carries MONO WAY over SULLIVAN CREEK. It was built in 1991, making it 35 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 36.6 meters (120 feet) end to end. Daily traffic averages 25,060 vehicles, placing it in the heavily-trafficked tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MONO WAY compares

▲ 1.1
Load rating vs California average (31.3 t)
Bottom 41%
Lower load rating than 59% of California bridges
128
Bridges in Tuolumne · 9 in Poor condition
MONO WAY 32.4 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
86.3 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
27.0
Essentiality /15
5.3
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1991
Material
Concrete Continuous
Number of Spans
2
Structure Length
36.6 m (120 ft)
Deck Width
24.2 m (79 ft)
Owner
County Highway Agency
Avg Daily Traffic
25,060 vehicles/day
Structure Number
32C0079

Condition Analysis

  • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

MONO WAY is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare MONO WAY against other structures in Tuolumne and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MONO WAY?

MONO WAY in Tuolumne, California has a deck rating of 4/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is MONO WAY inspected?

MONO WAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 25,060 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MONO WAY is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MONO WAY?

MONO WAY has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining MONO WAY?

MONO WAY is owned and maintained by County Highway Agency.

How old is MONO WAY and does age affect safety?

MONO WAY was built in 1991, making it 35 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.