FHWA NBI 2024 Inspection record Public-domain dataset

I75 350029M

Carrying I75 350029M over CSX RAILROAD

1.4 MI N OF I-24 JUNCTION, Hamilton, Tennessee

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating

Bridge Snapshot: I75 350029M

The I75 350029M bridge in Hamilton, Tennessee carries I75 350029M over CSX RAILROAD. It was built in 1960, making it 66 years old today. It was last reconstructed in 1992, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 42.7 meters (140 feet) end to end. Daily traffic averages 137,904 vehicles, placing it in the heavily-trafficked tier of Tennessee bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I75 350029M compares

▲ 2.9
Load rating vs Tennessee average (29.5 t)
Bottom 39%
Lower load rating than 61% of Tennessee bridges
464
Bridges in Hamilton · 23 in Poor condition
I75 350029M 32.4 t
Tennessee average 29.5 t

Live comparison across Tennessee.

Historical Sufficiency Rating

PlainBridge-computed
70.9 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
20.9
Essentiality /15
0.0
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1960
Last Reconstructed
1992
Material
Prestressed Concrete
Number of Spans
3
Structure Length
42.7 m (140 ft)
Deck Width
39.6 m (130 ft)
Owner
State Highway Agency
Avg Daily Traffic
137,904 vehicles/day
Structure Number
33I00750023

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether I75 350029M is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I75 350029M against other structures in Hamilton and across Tennessee. Tennessee bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I75 350029M?

I75 350029M in Hamilton, Tennessee has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is I75 350029M inspected?

I75 350029M's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 137,904 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I75 350029M is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I75 350029M?

I75 350029M has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining I75 350029M?

I75 350029M is owned and maintained by State Highway Agency.

How old is I75 350029M and does age affect safety?

I75 350029M was built in 1960, making it 66 years old and last reconstructed in 1992.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.