FHWA NBI 2024 Inspection record Public-domain dataset

TEMPLETON ROAD

Carrying TEMPLETON ROAD over BEAR CREEK

050 WEST OF CHESHIRE, Lane, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
36 t Inventory load rating

Bridge Snapshot: TEMPLETON ROAD

The TEMPLETON ROAD bridge in Lane, Oregon carries TEMPLETON ROAD over BEAR CREEK. It was built in 1981, making it 45 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 7.3 meters (24 feet) end to end. Daily traffic averages 157 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 36.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TEMPLETON ROAD compares

▲ 3.7
Load rating vs Oregon average (32.3 t)
Top 35%
Higher load rating than 65% of Oregon bridges
1,010
Bridges in Lane · 13 in Poor condition
TEMPLETON ROAD 36.0 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
60.8 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
26.0
Essentiality /15
12.8
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
36.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1981
Material
Prestressed Concrete
Number of Spans
1
Structure Length
7.3 m (24 ft)
Deck Width
8.5 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
157 vehicles/day
Structure Number
39C371363500260

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

TEMPLETON ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare TEMPLETON ROAD against other structures in Lane and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TEMPLETON ROAD?

TEMPLETON ROAD in Lane, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is TEMPLETON ROAD inspected?

TEMPLETON ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 157 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TEMPLETON ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TEMPLETON ROAD?

TEMPLETON ROAD has an NBI inventory load rating of 36.0 metric tons.

Who is responsible for maintaining TEMPLETON ROAD?

TEMPLETON ROAD is owned and maintained by County Highway Agency.

How old is TEMPLETON ROAD and does age affect safety?

TEMPLETON ROAD was built in 1981, making it 45 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.