FHWA NBI 2024 Inspection record Public-domain dataset

BAILEY HILL

Carrying BAILEY HILL over AMAZON CREEK

EUGENE BAILEYH&AMAZON, Lane, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
34 t Inventory load rating

Bridge Snapshot: BAILEY HILL

The BAILEY HILL bridge in Lane, Oregon carries BAILEY HILL over AMAZON CREEK. It was built in 1973, making it 53 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 25.0 meters (82 feet) end to end. Daily traffic averages 16,813 vehicles, placing it in the heavily-trafficked tier of Oregon bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 33.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BAILEY HILL compares

▲ 1.3
Load rating vs Oregon average (32.3 t)
Top 41%
Higher load rating than 59% of Oregon bridges
1,010
Bridges in Lane · 13 in Poor condition
BAILEY HILL 33.6 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
98.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
13.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
33.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1973
Material
Prestressed Concrete
Number of Spans
3
Structure Length
25.0 m (82 ft)
Deck Width
17.1 m (56 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
16,813 vehicles/day
Structure Number
40039 000 00011

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether BAILEY HILL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BAILEY HILL against other structures in Lane and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BAILEY HILL?

BAILEY HILL in Lane, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is BAILEY HILL inspected?

BAILEY HILL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 16,813 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BAILEY HILL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BAILEY HILL?

BAILEY HILL has an NBI inventory load rating of 33.6 metric tons.

Who is responsible for maintaining BAILEY HILL?

BAILEY HILL is owned and maintained by City/Municipal Highway Agency.

How old is BAILEY HILL and does age affect safety?

BAILEY HILL was built in 1973, making it 53 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.