FHWA NBI 2024 Inspection record Public-domain dataset

RAILROAD AVENUE

Carrying RAILROAD AVENUE over CSX RR

0.1 S 145TH ST, Lake, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
30 t Inventory load rating

Bridge Snapshot: RAILROAD AVENUE

The RAILROAD AVENUE bridge in Lake, Indiana carries RAILROAD AVENUE over CSX RR. It was built in 2014, making it 12 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 29.6 meters (97 feet) end to end. Daily traffic averages 11,057 vehicles, placing it in the heavily-trafficked tier of Indiana bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 29.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RAILROAD AVENUE compares

▼ 5.8
Load rating vs Indiana average (35.6 t)
Bottom 26%
Lower load rating than 74% of Indiana bridges
488
Bridges in Lake · 27 in Poor condition
RAILROAD AVENUE 29.8 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
75.0 / 100 - historical 50–79.9 band
Structural adequacy /55
53.6
Serviceability /30
13.0
Essentiality /15
8.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
29.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2014
Material
Prestressed Concrete
Number of Spans
1
Structure Length
29.6 m (97 ft)
Deck Width
18.8 m (62 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
11,057 vehicles/day
Structure Number
4500233

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether RAILROAD AVENUE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RAILROAD AVENUE against other structures in Lake and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RAILROAD AVENUE?

RAILROAD AVENUE in Lake, Indiana has a deck rating of 6/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is RAILROAD AVENUE inspected?

RAILROAD AVENUE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11,057 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RAILROAD AVENUE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RAILROAD AVENUE?

RAILROAD AVENUE has an NBI inventory load rating of 29.8 metric tons.

Who is responsible for maintaining RAILROAD AVENUE?

RAILROAD AVENUE is owned and maintained by City/Municipal Highway Agency.

How old is RAILROAD AVENUE and does age affect safety?

RAILROAD AVENUE was built in 2014, making it 12 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.