FHWA NBI 2024 Inspection record Public-domain dataset

FAU 1258 297434J

Carrying FAU 1258 297434J over CNIC RAILROAD

IN RIPLEY, Lauderdale, Tennessee

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
31 t Inventory load rating

Bridge Snapshot: FAU 1258 297434J

The FAU 1258 297434J bridge in Lauderdale, Tennessee carries FAU 1258 297434J over CNIC RAILROAD. It was built in 1987, making it 39 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 75.9 meters (249 feet) end to end. Daily traffic averages 4,194 vehicles, placing it in the moderately-trafficked tier of Tennessee bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 30.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FAU 1258 297434J compares

▲ 1.3
Load rating vs Tennessee average (29.5 t)
Bottom 37%
Lower load rating than 63% of Tennessee bridges
258
Bridges in Lauderdale · 17 in Poor condition
FAU 1258 297434J 30.8 t
Tennessee average 29.5 t

Live comparison across Tennessee.

Historical Sufficiency Rating

PlainBridge-computed
83.6 / 100 - historical 80–100 band
Structural adequacy /55
44.3
Serviceability /30
27.0
Essentiality /15
14.3
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
30.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1987
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
75.9 m (249 ft)
Deck Width
14.0 m (46 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
4,194 vehicles/day
Structure Number
49SR0190033

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether FAU 1258 297434J is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FAU 1258 297434J against other structures in Lauderdale and across Tennessee. Tennessee bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAU 1258 297434J?

FAU 1258 297434J in Lauderdale, Tennessee has a deck rating of 7/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FAU 1258 297434J inspected?

FAU 1258 297434J's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,194 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAU 1258 297434J is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAU 1258 297434J?

FAU 1258 297434J has an NBI inventory load rating of 30.8 metric tons.

Who is responsible for maintaining FAU 1258 297434J?

FAU 1258 297434J is owned and maintained by City/Municipal Highway Agency.

How old is FAU 1258 297434J and does age affect safety?

FAU 1258 297434J was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.