FHWA NBI 2024 Inspection record Public-domain dataset

NFA A191

Carrying NFA A191 over NEW CUT RD. / I65

NEAR COLUMBIA TENN., Maury, Tennessee

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Unknown

Bridge Snapshot: NFA A191

The NFA A191 bridge in Maury, Tennessee carries NFA A191 over NEW CUT RD. / I65. It was built in 1965, making it 61 years old today. The structure is built primarily of concrete continuous. Daily traffic averages 52,122 vehicles, placing it in the heavily-trafficked tier of Tennessee bridges.

The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. No reported major component scores in the Poor range under the current federal condition thresholds.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NFA A191 compares

433
Bridges in Maury · 27 in Poor condition

Live comparison across Tennessee.

Historical Sufficiency Rating

PlainBridge-computed
60.3 / 100 - historical 50–79.9 band
Structural adequacy /55
33.6
Serviceability /30
14.7
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Overall Condition
Unrated

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1965
Material
Concrete Continuous
Avg Daily Traffic
52,122 vehicles/day
Structure Number
60I00650007

How to read this record

This page shows what the last federal inspection recorded, not whether NFA A191 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NFA A191 against other structures in Maury and across Tennessee. Tennessee bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NFA A191?

NFA A191 in Maury, Tennessee on the FHWA's 0–9 scale.

How often is NFA A191 inspected?

NFA A191's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 52,122 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NFA A191 is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NFA A191?

An inventory load rating is not recorded for NFA A191.

Who is responsible for maintaining NFA A191?

Ownership is not specified for NFA A191 in the NBI.

How old is NFA A191 and does age affect safety?

NFA A191 was built in 1965, making it 61 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.