FHWA NBI 2024 Inspection record Public-domain dataset

MIDWAY Rd

Carrying MIDWAY Rd over ROCKY Run Creek

00.20 W of COLOMA Rd, Parke, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
6 t Inventory load rating

Bridge Snapshot: MIDWAY Rd

The MIDWAY Rd bridge in Parke, Indiana carries MIDWAY Rd over ROCKY Run Creek. It was built in 1920, making it 106 years old today. The structure is built primarily of concrete and spans 1 section, stretching 7.2 meters (24 feet) end to end. Daily traffic averages 141 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 3/9, substructure at 5/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 6.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MIDWAY Rd compares

▼ 29.2
Load rating vs Indiana average (35.6 t)
Bottom 1%
Lower load rating than 99% of Indiana bridges
195
Bridges in Parke · 36 in Poor condition
MIDWAY Rd 6.4 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
16.4 / 100 - historical under-20 band
Structural adequacy /55
0.0
Serviceability /30
2.0
Essentiality /15
14.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
3/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
6.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1920
Material
Concrete
Number of Spans
1
Structure Length
7.2 m (24 ft)
Deck Width
6.7 m (22 ft)
Owner
County Highway Agency
Avg Daily Traffic
141 vehicles/day
Structure Number
6100235

Condition Analysis

  • At 3/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) is in poor condition (3/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

MIDWAY Rd is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare MIDWAY Rd against other structures in Parke and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MIDWAY Rd?

MIDWAY Rd in Parke, Indiana has a deck rating of 3/9, superstructure rating of 3/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is MIDWAY Rd inspected?

MIDWAY Rd's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 141 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MIDWAY Rd is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MIDWAY Rd?

MIDWAY Rd has an NBI inventory load rating of 6.4 metric tons.

Who is responsible for maintaining MIDWAY Rd?

MIDWAY Rd is owned and maintained by County Highway Agency.

How old is MIDWAY Rd and does age affect safety?

MIDWAY Rd was built in 1920, making it 106 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.