FHWA NBI 2024 Inspection record Public-domain dataset

MOSIER CREEK ROAD

Carrying MOSIER CREEK ROAD over MOSIER CREEK

2.0 MI S OF WILSON RD, Wasco, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
20 t Inventory load rating

Bridge Snapshot: MOSIER CREEK ROAD

The MOSIER CREEK ROAD bridge in Wasco, Oregon carries MOSIER CREEK ROAD over MOSIER CREEK. It was built in 1950, making it 76 years old today. The structure is built primarily of wood or timber and spans 1 section, stretching 9.1 meters (30 feet) end to end. Daily traffic averages 229 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 3/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 19.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MOSIER CREEK ROAD compares

▼ 12.5
Load rating vs Oregon average (32.3 t)
Bottom 19%
Lower load rating than 81% of Oregon bridges
148
Bridges in Wasco · 12 in Poor condition
MOSIER CREEK ROAD 19.8 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
22.4 / 100 - historical 20–49.9 band
Structural adequacy /55
0.4
Serviceability /30
17.2
Essentiality /15
4.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
3/9
Poor (1–4)
Inventory Load Rating
19.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1950
Material
Wood or Timber
Number of Spans
1
Structure Length
9.1 m (30 ft)
Deck Width
7.4 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
229 vehicles/day
Structure Number
65C62 403000458

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates poor at 3/9, advanced deterioration that should be prioritized for repair.

How to read this record

MOSIER CREEK ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare MOSIER CREEK ROAD against other structures in Wasco and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MOSIER CREEK ROAD?

MOSIER CREEK ROAD in Wasco, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 3/9 on the FHWA's 0–9 scale.

How often is MOSIER CREEK ROAD inspected?

MOSIER CREEK ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 229 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MOSIER CREEK ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MOSIER CREEK ROAD?

MOSIER CREEK ROAD has an NBI inventory load rating of 19.8 metric tons.

Who is responsible for maintaining MOSIER CREEK ROAD?

MOSIER CREEK ROAD is owned and maintained by County Highway Agency.

How old is MOSIER CREEK ROAD and does age affect safety?

MOSIER CREEK ROAD was built in 1950, making it 76 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.