148 public highway bridges tracked in the FHWA National Bridge Inventory: 31.8% rated Good, 60.1% Fair, 8.1% Poor.

148
Public bridges
31.8%
Good condition
8.1%
Poor condition

The verdict

According to the Federal Highway Administration's 2024 National Bridge Inventory.

Wasco County pairs a higher-than-median Poor-condition share among rated counties in the state with an older average build year than the state inventory.

33rd
of 36 on Poor share
8.1%
Poor-condition share
148
public highway bridges
1968
avg year built

Poor is an FHWA condition category from the lowest applicable component rating (4 or below), not a live crossing-safety or closure decision. Rankings cover counties with at least five public highway bridges.

Wasco County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Wasco County ranks #33 of 36 Oregon counties with at least 5 public highway bridges on Poor-condition share (lower share ranks better; currently 8.1%). Wasco County, Oregon contains 148 public highway bridges. Roughly 31.8% are rated “Good,” 60.1% “Fair,” and 8.1% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

Total bridges

148

Public highway bridges in Wasco County

Good condition

31.8%

47 of 148 rated 7-9

Fair condition

60.1%

89 of 148 rated 5-6

Poor condition

8.1%

12 of 148 rated 4 or below

In-state Poor-share rank

#33 of 36

Among Oregon counties with 5+ bridges, lower share ranks better

Condition distribution

Share of 148 NBI-tracked bridges by lowest applicable component rating.

Good
31.8% (47)
Fair
60.1% (89)
Poor
8.1% (12)

Wasco County's Poor-condition bridges carry 1,941 vehicle crossings a day

That is 0.4% of the county's reported daily bridge traffic on 7.5% of its bridges: Poor-condition structures carry less traffic than their share of the inventory. Each Poor bridge averages 176 crossings a day against 4,192 for a Good-condition one. A Poor rating is a condition category, not a closure or a live safety judgement; it means the lowest applicable component rating is 4 or below.

Computed over the 147 of 148 bridges in this county that report an average daily traffic count. Source: FHWA National Bridge Inventory, 2024 release.

62.2% of Wasco County's bridges have passed the 50-year mark

92 of the 148 bridges with a recorded construction year were built in 1974 or earlier. Age alone is not a defect: a well-maintained older bridge can rate Good, and 31.8% of this county's inventory does. Even so, this older cohort is the population from which future Poor ratings are drawn, which is why the age profile below matters alongside the condition split above.

Cutoff derives from the 2024 release year minus a 50-year design life. Source: FHWA National Bridge Inventory, 2024 release.

One structure carries 32.2% of the county's Poor-condition bridge traffic

MILL CR RD over MILL CREEK, built 1941, carries 625 vehicles a day, the most of any Poor-rated structure here. The county's Poor-condition exposure is concentrated rather than evenly spread, so the 12-bridge count understates how much of the daily burden sits on a single crossing.

Share is of the 1,941 daily crossings on Poor-rated bridges that report a traffic count. Source: FHWA National Bridge Inventory, 2024 release.

When Wasco County's bridges were built

148 bridges with a recorded construction year, grouped by decade

bridges

What this shows Construction peaked in the 1960s, when 32 of the county's bridges still in the inventory were built, which is 21.6% of those with a recorded year. That cohort is now 55 to 64 years old in the 2024 inventory. Its average build year is 1968, 7 years older than the Oregon average of 1975.

Source FHWA National Bridge Inventory (year built) As of 2024 NBI release

How Wasco County compares with Oregon's closest counties by inventory size

The 5 Oregon counties nearest Wasco County in number of bridges, with their condition splits. Its 8.1% Poor share is the 6th-lowest of these 6. Its average build year of 1968 against a peer-group mean of 1978 is 10 years older.

Showing the 5 closest of 35 Oregon counties eligible for comparison.

Bridge inventory size and condition shares for Wasco County and the 5 Oregon counties closest to it in inventory size
County Bridges Poor
Polk County 161 6.8%
Clatsop County 155 3.9%
Deschutes County 152 1.3%
Yamhill County 149 4.7%
Wasco County (this page) 148 8.1%
Grant County 144 5.6%

Each share is of that county's own total tracked bridges; peers are the counties with 5 or more bridges whose inventory size is closest to Wasco County's. Source: FHWA National Bridge Inventory, 2024 release.

Nationwide counties with similar inventory size or average build year

Two NBI-derived peer sets for Wasco County, both outside Oregon so the neighborhoods are not the same-state size table above.

Similar inventory size

Nearest county inventories outside OR (148 bridges here).

Similar average build year

Nearest mean year-built outside OR (1968 here).

Source: FHWA National Bridge Inventory, 2024 release. Peers floor at 10 bridges so stub inventories cannot own the match.

All bridges (148)

OLD DUFUR SOUTH

Fair

Over: EIGHTMILE CREEK

0.2 MI W OF 8 MI RD, Wasco, OR

Built 1914 Load: 6.8 t ADT: 26

L TUB SPRINGS RD

Fair

Over: ANTELOPE CREEK

0.2 MI S OF HWY 293, Wasco, OR

Built 1945 Load: 6.8 t ADT: 86

W 6TH STREET

Fair

Over: MILL CREEK

CITY OF THE DALLES, Wasco, OR

Built 1920 Load: 8.1 t ADT: 15,627

WILSON RD

Fair

Over: NORTH FORK MOSIER CREEK

0.1 MI S OF MOSIER CRK RD, Wasco, OR

Built 1950 Load: 8.1 t ADT: 55

Jordan Cr. RD

Fair

Over: Jordan Cr.

Over Jordan Creek, Wasco, OR

Built 1961 Load: 10.0 t ADT: 11

UPPER TUB SPRINGS

Fair

Over: COLD CAMP CREEK

AT SANTESSON ROAD, Wasco, OR

Built 1974 Load: 10.0 t ADT: 6

ADKISSON RD

Fair

Over: DRY CREEK

2.1 MI. E. OF HWY 197, Wasco, OR

Built 1955 Load: 10.7 t ADT: 20

I-84 (HWY 002)

Fair

Over: HOSTELLER WAY

IN THE DALLES, Wasco, OR

Built 1957 Load: 11.0 t ADT: 21,174

Jordan Cr. RD

Fair

Over: Jordan Cr.

Over Jordan Creek, Wasco, OR

Built 1961 Load: 11.0 t ADT: 11

FIFTEEN MILE RD

Fair

Over: FIFTEENMILE CREEK

FREE BRIDGE, Wasco, OR

Built 1964 Load: 11.3 t ADT: 68

I-84 (HWY 002)

Fair

Over: UPRR

017 MI E THE DALLES, Wasco, OR

Built 1964 Load: 12.0 t ADT: 18,268

MILL CR RD

Fair

Over: MILL CREEK

2.0 MI. S.ON MILL CRK RD, Wasco, OR

Built 1941 Load: 12.6 t ADT: 770

MILL CR RD

Fair

Over: MILL CREEK

3.1 MI. S. ON MILL CRK RD, Wasco, OR

Built 1941 Load: 13.3 t ADT: 715

I-84 (HWY 002)

Fair

Over: BNSF

103 MI E THE DALLES, Wasco, OR

Built 1965 Load: 13.6 t ADT: 17,050

I-84 (HWY 002)

Fair

Over: CHENOWETH CREEK

004 MI W THE DALLES, Wasco, OR

Built 1954 Load: 13.9 t ADT: 21,174

I-84 (HWY 002)

Fair

Over: HWY 292 O-XING

IN THE DALLES, Wasco, OR

Built 1964 Load: 13.9 t ADT: 23,043

I-84 (HWY 002) WB

Fair

Over: UPRR

100 MI E THE DALLES, Wasco, OR

Built 1965 Load: 13.9 t ADT: 8,525

FAX ROAD

Fair

Over: FIFTEENMILE CREEK

1.0 MI S. OF WARD RD., Wasco, OR

Built 1982 Load: 13.9 t ADT: 34

I-84 (HWY 002)

Fair

Over: ROCK CREEK

IN MOSIER, Wasco, OR

Built 1953 Load: 14.3 t ADT: 22,259

I-84 (HWY 002) WB

Fair

Over: UPRR

041 MI E THE DALLES, Wasco, OR

Built 1965 Load: 14.6 t ADT: 8,990

SEVENMILE HILL RD

Fair

Over: SEVENMILE CREEK

1.4 MI N OF CHENOWETH RD, Wasco, OR

Built 1940 Load: 14.9 t ADT: 608

US 197 (HWY 004)

Fair

Over: BNSF & DESCHUTES R

IN MAUPIN, Wasco, OR

Built 1929 Load: 15.2 t ADT: 859

US 197 (HWY 004)

Fair

Over: COLUMBIA RIVER

EAST END OF THE DALLES, Wasco, OR

Built 1954 Load: 15.6 t ADT: 6,802

I-84 (HWY 002)

Fair

Over: UPRR

137 MI E THE DALLES, Wasco, OR

Built 1965 Load: 15.9 t ADT: 17,050

FIVEMILE ROAD

Fair

Over: FIVEMILE CREEK

9.0 MI W OF HWY 195, Wasco, OR

Built 1955 Load: 15.9 t ADT: 41

BOYD LOOP ROAD

Fair

Over: 15 MILE CREEK

00.6 MI SOUTH OF BOYD, Wasco, OR

Built 1925 Load: 16.2 t ADT: 252

OR 206 (HWY 301)

Fair

Over: DESCHUTES RIVER

029 MI E CELILO, Wasco, OR

Built 1955 Load: 16.5 t ADT: 761

HWY 100

Fair

Over: MOSIER CREEK

IN MOSIER, Wasco, OR

Built 1920 Load: 16.8 t ADT: 619

HWY 292

Fair

Over: HOG CREEK CANYON

034 MI W ROWENA, Wasco, OR

Built 1920 Load: 17.5 t ADT: 315

DUFUR GAP ROAD

Fair

Over: MAYS CREEK

0.6 MI S OF POLE RD, Wasco, OR

Built 1945 Load: 17.8 t ADT: 152

HWY 100

Fair

Over: DRY CANYON CREEK

028 MI W ROWENA, Wasco, OR

Built 1921 Load: 18.1 t ADT: 315

LOWER EIGHTMILE RD

Fair

Over: EIGHTMILE CREEK

3.8 MI N OF HWY 197, Wasco, OR

Built 1922 Load: 18.1 t ADT: 75

US 26 (HWY 053)

Fair

Over: MILL CREEK

038 MI N WASCO JEFF CO LN, Wasco, OR

Built 1948 Load: 18.1 t ADT: 4,205

SMOCK ROAD

Fair

Over: GATE CREEK

4.7 MI. S OF WAMIC, Wasco, OR

Built 1957 Load: 18.1 t ADT: 92

US 197 (HWY 004)

Fair

Over: FIFTEENMILE CREEK

003 MI S DUFUR E C LMTS, Wasco, OR

Built 1963 Load: 18.5 t ADT: 1,291

I-84 (HWY 002) CO

Fair

Over: UPRR

IN MOSIER, Wasco, OR

Built 1953 Load: 19.1 t ADT: 2,587

US 197 (HWY 004)

Fair

Over: HWY 002

006 MI S ORE WASH BORDER, Wasco, OR

Built 1964 Load: 19.1 t ADT: 5,699

I-84 (HWY 002) CO

Fair

Over: I-84 (HWY 002)

IN MOSIER, Wasco, OR

Built 1953 Load: 19.4 t ADT: 1,353

LOWER EIGHTMILE RD

Fair

Over: EIGHTMILE CREEK

1.4 MI. N. OF HWY 197, Wasco, OR

Built 1923 Load: 20.1 t ADT: 75

OR 216 (HWY 044)

Fair

Over: WAPINITIA CREEK

094 MI W HWY NO 4 JCT, Wasco, OR

Built 1975 Load: 20.1 t ADT: 383

FAIRGROUNDS ROAD

Fair

Over: BADGER CREEK

2.0 MI W OF HWY 197, Wasco, OR

Built 1960 Load: 20.1 t ADT: 109

LOWER EIGHTMILE RD

Fair

Over: EIGHTMILE CREEK

4.0 MI. N. OF HWY 197, Wasco, OR

Built 1922 Load: 20.4 t ADT: 75

EASTON CANYON ROAD

Fair

Over: EASTON CANYON #4

T1S R14E SECTION 33, Wasco, OR

Built 1940 Load: 20.6 t ADT: 54

VIEWPOINT ROAD

Fair

Over: FIFTEEN MILE CREEK

0.5 MI. E. OF OLD HWY, Wasco, OR

Built 1919 Load: 20.7 t ADT: 56

TYGH VALLEY ROAD

Fair

Over: WHITE RIVER

010 MI EAST OF TYGH VALLY, Wasco, OR

Built 1983 Load: 20.7 t ADT: 1,304

US 197 (HWY 004)

Fair

Over: TYGH CREEK

012 MI S TYGH VALLEY, Wasco, OR

Built 1962 Load: 20.7 t ADT: 1,103

FIFTEEN MILE RD

Fair

Over: FIFTEENMILE CREEK

BROOKHOUSE, Wasco, OR

Built 1952 Load: 20.9 t ADT: 133

EASTON CANYON ROAD

Fair

Over: DRY CREEK

0.4 MI E OF LONG HOLLOW R, Wasco, OR

Built 1958 Load: 21.1 t ADT: 59

DUFUR VALLEY ROAD

Fair

Over: RAIL HOLLOW CREEK

1.9 MI OF DUFUR, Wasco, OR

Built 1940 Load: 21.2 t ADT: 871

BAKEOVEN RD

Fair

Over: BAKEOVEN CREEK

00.5 MI NE MAUPIN ORE, Wasco, OR

Built 1952 Load: 21.7 t ADT: 151
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.