FHWA NBI 2024 Inspection record Public-domain dataset

CLEVELAND ROAD

Carrying CLEVELAND ROAD over ST JOSEPH RIVER

00.90 W SR 933, St. Joseph, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
31 t Inventory load rating

Bridge Snapshot: CLEVELAND ROAD

The CLEVELAND ROAD bridge in St. Joseph, Indiana carries CLEVELAND ROAD over ST JOSEPH RIVER. It was built in 1970, making it 56 years old today. It was last reconstructed in 2019, extending its service life. The structure is built primarily of steel continuous and spans 4 sections, stretching 135.9 meters (446 feet) end to end. Daily traffic averages 17,904 vehicles, placing it in the heavily-trafficked tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 30.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CLEVELAND ROAD compares

▼ 4.9
Load rating vs Indiana average (35.6 t)
Bottom 29%
Lower load rating than 71% of Indiana bridges
228
Bridges in St. Joseph · 9 in Poor condition
CLEVELAND ROAD 30.7 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
77.0 / 100 - historical 50–79.9 band
Structural adequacy /55
54.3
Serviceability /30
14.0
Essentiality /15
8.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
30.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Last Reconstructed
2019
Material
Steel Continuous
Number of Spans
4
Structure Length
135.9 m (446 ft)
Deck Width
22.0 m (72 ft)
Owner
County Highway Agency
Avg Daily Traffic
17,904 vehicles/day
Structure Number
7100015

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether CLEVELAND ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CLEVELAND ROAD against other structures in St. Joseph and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CLEVELAND ROAD?

CLEVELAND ROAD in St. Joseph, Indiana has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CLEVELAND ROAD inspected?

CLEVELAND ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 17,904 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CLEVELAND ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CLEVELAND ROAD?

CLEVELAND ROAD has an NBI inventory load rating of 30.7 metric tons.

Who is responsible for maintaining CLEVELAND ROAD?

CLEVELAND ROAD is owned and maintained by County Highway Agency.

How old is CLEVELAND ROAD and does age affect safety?

CLEVELAND ROAD was built in 1970, making it 56 years old and last reconstructed in 2019.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.