FHWA NBI 2024 Inspection record Public-domain dataset

FAP 29

Carrying FAP 29 over OVERFLOW PINEY RIVER

IN SPRING CITY CITY LIMIT, Rhea, Tennessee

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
26 t Inventory load rating

Bridge Snapshot: FAP 29

The FAP 29 bridge in Rhea, Tennessee carries FAP 29 over OVERFLOW PINEY RIVER. It was built in 2008, making it 18 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 40.4 meters (133 feet) end to end. Daily traffic averages 5,821 vehicles, placing it in the moderately-trafficked tier of Tennessee bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 26.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FAP 29 compares

▼ 3.3
Load rating vs Tennessee average (29.5 t)
Bottom 26%
Lower load rating than 74% of Tennessee bridges
100
Bridges in Rhea · 6 in Poor condition
FAP 29 26.2 t
Tennessee average 29.5 t

Live comparison across Tennessee.

Historical Sufficiency Rating

PlainBridge-computed
52.0 / 100 - historical 50–79.9 band
Structural adequacy /55
25.0
Serviceability /30
28.0
Essentiality /15
0.0
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
26.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2008
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
40.4 m (133 ft)
Deck Width
22.9 m (75 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,821 vehicles/day
Structure Number
72SR0290013

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

FAP 29 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare FAP 29 against other structures in Rhea and across Tennessee. Tennessee bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAP 29?

FAP 29 in Rhea, Tennessee has a deck rating of 7/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is FAP 29 inspected?

FAP 29's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,821 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAP 29 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAP 29?

FAP 29 has an NBI inventory load rating of 26.2 metric tons.

Who is responsible for maintaining FAP 29?

FAP 29 is owned and maintained by State Highway Agency.

How old is FAP 29 and does age affect safety?

FAP 29 was built in 2008, making it 18 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.