FHWA NBI 2024 Inspection record Public-domain dataset

GOSHEN T324-264

Carrying GOSHEN T324-264 over OLDTOWN CREEK

1 MILE S OF PHILA CORP, Tuscarawas, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
78 t Inventory load rating

Bridge Snapshot: GOSHEN T324-264

The GOSHEN T324-264 bridge in Tuscarawas, Ohio carries GOSHEN T324-264 over OLDTOWN CREEK. It was built in 2007, making it 19 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 18.0 meters (59 feet) end to end. Daily traffic averages 194 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 9/9, substructure at 9/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 77.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How GOSHEN T324-264 compares

▲ 40.3
Load rating vs Ohio average (37.5 t)
Top 2%
Higher load rating than 98% of Ohio bridges
337
Bridges in Tuscarawas · 8 in Poor condition
GOSHEN T324-264 77.8 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
96.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
77.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2007
Material
Prestressed Concrete
Number of Spans
1
Structure Length
18.0 m (59 ft)
Deck Width
8.5 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
194 vehicles/day
Structure Number
7933169

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • At 9/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 9/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether GOSHEN T324-264 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare GOSHEN T324-264 against other structures in Tuscarawas and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GOSHEN T324-264?

GOSHEN T324-264 in Tuscarawas, Ohio has a deck rating of 8/9, superstructure rating of 9/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is GOSHEN T324-264 inspected?

GOSHEN T324-264's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 194 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GOSHEN T324-264 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GOSHEN T324-264?

GOSHEN T324-264 has an NBI inventory load rating of 77.8 metric tons.

Who is responsible for maintaining GOSHEN T324-264?

GOSHEN T324-264 is owned and maintained by County Highway Agency.

How old is GOSHEN T324-264 and does age affect safety?

GOSHEN T324-264 was built in 2007, making it 19 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.