FHWA NBI 2024 Inspection record Public-domain dataset

OXFORD TR 2

Carrying OXFORD TR 2 over POSTBOY CREEK

.5 MI S OF JCT CR 3, Tuscarawas, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
52 t Inventory load rating

Bridge Snapshot: OXFORD TR 2

The OXFORD TR 2 bridge in Tuscarawas, Ohio carries OXFORD TR 2 over POSTBOY CREEK. It was built in 2003, making it 23 years old today. The structure is built primarily of concrete and spans 1 section, stretching 9.4 meters (31 feet) end to end. Daily traffic averages 209 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 9/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 51.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How OXFORD TR 2 compares

▲ 14.3
Load rating vs Ohio average (37.5 t)
Top 13%
Higher load rating than 87% of Ohio bridges
337
Bridges in Tuscarawas · 8 in Poor condition
OXFORD TR 2 51.8 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
90.6 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
23.8
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
51.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2003
Material
Concrete
Number of Spans
1
Structure Length
9.4 m (31 ft)
Deck Width
7.3 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
209 vehicles/day
Structure Number
7933614

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • At 9/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether OXFORD TR 2 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OXFORD TR 2 against other structures in Tuscarawas and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OXFORD TR 2?

OXFORD TR 2 in Tuscarawas, Ohio has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is OXFORD TR 2 inspected?

OXFORD TR 2's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 209 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OXFORD TR 2 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OXFORD TR 2?

OXFORD TR 2 has an NBI inventory load rating of 51.8 metric tons.

Who is responsible for maintaining OXFORD TR 2?

OXFORD TR 2 is owned and maintained by County Highway Agency.

How old is OXFORD TR 2 and does age affect safety?

OXFORD TR 2 was built in 2003, making it 23 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.