FHWA NBI 2024 Inspection record Public-domain dataset

FAP 14 297767K

Carrying FAP 14 297767K over CNIC RR & NONCONNAH CR

0.5 MI S OF I-55 JCT, Shelby, Tennessee

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
19 t Inventory load rating

Bridge Snapshot: FAP 14 297767K

The FAP 14 297767K bridge in Shelby, Tennessee carries FAP 14 297767K over CNIC RR & NONCONNAH CR. It was built in 1964, making it 62 years old today. The structure is built primarily of steel continuous and spans 9 sections, stretching 227.2 meters (745 feet) end to end. Daily traffic averages 48,162 vehicles, placing it in the heavily-trafficked tier of Tennessee bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 19.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FAP 14 297767K compares

▼ 10.4
Load rating vs Tennessee average (29.5 t)
Bottom 6%
Lower load rating than 94% of Tennessee bridges
1,077
Bridges in Shelby · 37 in Poor condition
FAP 14 297767K 19.1 t
Tennessee average 29.5 t

Live comparison across Tennessee.

Historical Sufficiency Rating

PlainBridge-computed
59.4 / 100 - historical 50–79.9 band
Structural adequacy /55
39.2
Serviceability /30
11.0
Essentiality /15
11.2
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
19.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1964
Material
Steel Continuous
Number of Spans
9
Structure Length
227.2 m (745 ft)
Deck Width
15.1 m (50 ft)
Owner
State Highway Agency
Avg Daily Traffic
48,162 vehicles/day
Structure Number
79SR0140005

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether FAP 14 297767K is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FAP 14 297767K against other structures in Shelby and across Tennessee. Tennessee bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAP 14 297767K?

FAP 14 297767K in Shelby, Tennessee has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is FAP 14 297767K inspected?

FAP 14 297767K's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 48,162 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAP 14 297767K is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAP 14 297767K?

FAP 14 297767K has an NBI inventory load rating of 19.1 metric tons.

Who is responsible for maintaining FAP 14 297767K?

FAP 14 297767K is owned and maintained by State Highway Agency.

How old is FAP 14 297767K and does age affect safety?

FAP 14 297767K was built in 1964, making it 62 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.