FHWA NBI 2024 Inspection record Public-domain dataset

FAU 5250

Carrying FAU 5250 over RAILROAD RIGHT-OF-WAY

RAMP FROM SR57 TO SCOTT, Shelby, Tennessee

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
23 t Inventory load rating

Bridge Snapshot: FAU 5250

The FAU 5250 bridge in Shelby, Tennessee carries FAU 5250 over RAILROAD RIGHT-OF-WAY. It was built in 1958, making it 68 years old today. The structure is built primarily of concrete and spans 12 sections, stretching 96.0 meters (315 feet) end to end. Daily traffic averages 3,912 vehicles, placing it in the moderately-trafficked tier of Tennessee bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 23.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FAU 5250 compares

▼ 6.1
Load rating vs Tennessee average (29.5 t)
Bottom 13%
Lower load rating than 87% of Tennessee bridges
1,077
Bridges in Shelby · 37 in Poor condition
FAU 5250 23.4 t
Tennessee average 29.5 t

Live comparison across Tennessee.

Historical Sufficiency Rating

PlainBridge-computed
47.4 / 100 - historical 20–49.9 band
Structural adequacy /55
21.2
Serviceability /30
25.0
Essentiality /15
4.2
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
23.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1958
Material
Concrete
Number of Spans
12
Structure Length
96.0 m (315 ft)
Deck Width
13.9 m (46 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,912 vehicles/day
Structure Number
79SR0570011

Condition Analysis

  • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

FAU 5250 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare FAU 5250 against other structures in Shelby and across Tennessee. Tennessee bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAU 5250?

FAU 5250 in Shelby, Tennessee has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is FAU 5250 inspected?

FAU 5250's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,912 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAU 5250 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAU 5250?

FAU 5250 has an NBI inventory load rating of 23.4 metric tons.

Who is responsible for maintaining FAU 5250?

FAU 5250 is owned and maintained by State Highway Agency.

How old is FAU 5250 and does age affect safety?

FAU 5250 was built in 1958, making it 68 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.