FHWA NBI 2024 Inspection record Public-domain dataset

NAV LOCK BRIDGE

Carrying NAV LOCK BRIDGE over NAV LOCK CHANNEL

LOWER GRANITE DAM, Garfield, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
65 t Inventory load rating

Bridge Snapshot: NAV LOCK BRIDGE

The NAV LOCK BRIDGE bridge in Garfield, Washington carries NAV LOCK BRIDGE over NAV LOCK CHANNEL. It was built in 1982, making it 44 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 27.5 meters (90 feet) end to end. Daily traffic averages 150 vehicles, placing it in the lower-traffic tier of Washington bridges. It is owned and maintained by Army Corps of Engineers.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 64.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NAV LOCK BRIDGE compares

▲ 31.3
Load rating vs Washington average (33.5 t)
Top 5%
Higher load rating than 95% of Washington bridges
54
Bridges in Garfield · 4 in Poor condition
NAV LOCK BRIDGE 64.8 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
84.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
16.8
Essentiality /15
14.1
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
64.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1982
Material
Prestressed Concrete
Number of Spans
1
Structure Length
27.5 m (90 ft)
Deck Width
8.9 m (29 ft)
Owner
Army Corps of Engineers
Avg Daily Traffic
150 vehicles/day
Structure Number
CEPNPWWA0LGRNAV

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether NAV LOCK BRIDGE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NAV LOCK BRIDGE against other structures in Garfield and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NAV LOCK BRIDGE?

NAV LOCK BRIDGE in Garfield, Washington has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is NAV LOCK BRIDGE inspected?

NAV LOCK BRIDGE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 150 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NAV LOCK BRIDGE is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NAV LOCK BRIDGE?

NAV LOCK BRIDGE has an NBI inventory load rating of 64.8 metric tons.

Who is responsible for maintaining NAV LOCK BRIDGE?

NAV LOCK BRIDGE is owned and maintained by Army Corps of Engineers.

How old is NAV LOCK BRIDGE and does age affect safety?

NAV LOCK BRIDGE was built in 1982, making it 44 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.