FHWA NBI 2024 Inspection record Public-domain dataset

HWY CHACE RD

Carrying HWY CHACE RD over ST140

1.2 MI S OF LAKEVIL T.L., Bristol, Massachusetts

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
25 t Inventory load rating

Bridge Snapshot: HWY CHACE RD

The HWY CHACE RD bridge in Bristol, Massachusetts carries HWY CHACE RD over ST140. It was built in 1957, making it 69 years old today. It was last reconstructed in 1968, extending its service life. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 74.4 meters (244 feet) end to end. Daily traffic averages 10,500 vehicles, placing it in the heavily-trafficked tier of Massachusetts bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 24.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HWY CHACE RD compares

▼ 16.4
Load rating vs Massachusetts average (41.2 t)
Bottom 11%
Lower load rating than 89% of Massachusetts bridges
384
Bridges in Bristol · 23 in Poor condition
HWY CHACE RD 24.8 t
Massachusetts average 41.2 t

Live comparison across Massachusetts.

Historical Sufficiency Rating

PlainBridge-computed
53.2 / 100 - historical 50–79.9 band
Structural adequacy /55
23.2
Serviceability /30
20.0
Essentiality /15
13.1
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
24.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1957
Last Reconstructed
1968
Material
Prestressed Concrete
Number of Spans
4
Structure Length
74.4 m (244 ft)
Deck Width
15.1 m (50 ft)
Owner
State Highway Agency
Avg Daily Traffic
10,500 vehicles/day
Structure Number
F090173YNDOTNBI

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

HWY CHACE RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare HWY CHACE RD against other structures in Bristol and across Massachusetts. Massachusetts bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY CHACE RD?

HWY CHACE RD in Bristol, Massachusetts has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is HWY CHACE RD inspected?

HWY CHACE RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY CHACE RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY CHACE RD?

HWY CHACE RD has an NBI inventory load rating of 24.8 metric tons.

Who is responsible for maintaining HWY CHACE RD?

HWY CHACE RD is owned and maintained by State Highway Agency.

How old is HWY CHACE RD and does age affect safety?

HWY CHACE RD was built in 1957, making it 69 years old and last reconstructed in 1968.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.