FHWA NBI 2024 Inspection record Public-domain dataset

2050 EAST ROAD

Carrying 2050 EAST ROAD over LITTLE WOOD RIVER

0.1 S. 1.5 E. GOODING, Gooding, Idaho

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
12 t Inventory load rating Lower than 97% of rated Idaho bridges

2050 EAST ROAD in Gooding, Idaho sits above 3% of rated Idaho bridges on inventory load rating (12 t), while its 1930 build year is earlier than 73% of Gooding's recorded-year cohort (80 bridges).

2050 EAST ROAD in Gooding, Idaho is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1930, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure ID:000000000024310

PRE-1950 · STEEL · SINGLE-SPAN · TIED-CTRL · TRACE-ADT · LIGHT-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • STEEL Steel
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • TRACE-ADT Trace ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: 2050 EAST ROAD

The 2050 EAST ROAD bridge in Gooding, Idaho carries 2050 EAST ROAD over LITTLE WOOD RIVER. It was built in 1930, making it 96 years old today. It was last reconstructed in 1967, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 10.4 meters (34 feet) end to end. Daily traffic averages 20 vehicles, placing it in the lower-traffic tier of Idaho bridges. It is owned and maintained by Other Local Agencies.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How 2050 EAST ROAD compares

▼ 21.5
Load rating vs Idaho average (33.3 t; 4,574 of 4,616 rated)
80
Bridges in Gooding · 6 in Poor condition

Age against the county: built in 1930, earlier than 58 of Gooding's 80 bridges with a recorded construction year (73%), against a county median build year of 1970. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

2050 EAST ROAD 11.8 t
Idaho average (4,574 of 4,616 rated) 33.3 t

Live comparison across Idaho bridges with a recorded inventory load rating (4,574 of 4,616 rated).

2050 EAST ROAD vs every rated Idaho bridge

Inventory load rating (metric tons), FHWA NBI, this state

12 Top 97% higher than 3% of 4,574 bridges

rated Idaho bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
11.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Gooding inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 80 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1930
Last Reconstructed
1967
Material
Steel
Number of Spans
1
Structure Length
10.4 m (34 ft)
Deck Width
7.5 m (25 ft)
Owner
Other Local Agencies
Avg Daily Traffic
20 vehicles/day
Structure Number
000000000024310

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear on file for this vintage.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration on the inspecting agency's 0-9 scale.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

2050 EAST ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare 2050 EAST ROAD against other structures in Gooding and across Idaho. Idaho bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 2050 EAST ROAD?

2050 EAST ROAD in Gooding, Idaho has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is 2050 EAST ROAD inspected?

2050 EAST ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 2050 EAST ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 2050 EAST ROAD?

2050 EAST ROAD has an NBI inventory load rating of 11.8 metric tons.

Who is responsible for maintaining 2050 EAST ROAD?

2050 EAST ROAD is owned and maintained by Other Local Agencies.

How old is 2050 EAST ROAD and does age affect safety?

2050 EAST ROAD was built in 1930, making it 96 years old and last reconstructed in 1967.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.