FHWA NBI 2024 Inspection record Public-domain dataset

WOLLARD BLVD S

Carrying WOLLARD BLVD S over MO 10

S 32 T 52 N R 27 W, Ray, Missouri

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
37 t Inventory load rating Higher than 62% of rated Missouri bridges

WOLLARD BLVD S in Ray, Missouri sits above 62% of rated Missouri bridges on inventory load rating (37 t), while its 1994 build year is earlier than 45% of Ray's recorded-year cohort (185 bridges).

WOLLARD BLVD S in Ray, Missouri is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1994, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure MO:2645

LATE-CENTURY · STEEL · MULTI-SPAN · SUB-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • STEEL Steel
  • MULTI-SPAN 2 spans
  • SUB-LED Substructure-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: WOLLARD BLVD S

The WOLLARD BLVD S bridge in Ray, Missouri carries WOLLARD BLVD S over MO 10. It was built in 1994, making it 32 years old today. The structure is built primarily of steel continuous and spans 2 sections, stretching 88.7 meters (291 feet) end to end. Daily traffic averages 3,107 vehicles, placing it in the moderately-trafficked tier of Missouri bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How WOLLARD BLVD S compares

▲ 3.2
Load rating vs Missouri average (33.7 t; 24,616 of 24,618 rated)
185
Bridges in Ray · 23 in Poor condition

Age against the county: built in 1994, earlier than 84 of Ray's 185 bridges with a recorded construction year (45%), against a county median build year of 1992. This is one of the newer structures in its county.

WOLLARD BLVD S 36.9 t
Missouri average (24,616 of 24,618 rated) 33.7 t

Live comparison across Missouri bridges with a recorded inventory load rating (24,616 of 24,618 rated).

WOLLARD BLVD S vs every rated Missouri bridge

Inventory load rating (metric tons), FHWA NBI, this state

37 Top 38% higher than 62% of 24,616 bridges

rated Missouri bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
36.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Ray inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 185 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1994
Material
Steel Continuous
Number of Spans
2
Structure Length
88.7 m (291 ft)
Deck Width
13.0 m (43 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,107 vehicles/day
Structure Number
2645

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether WOLLARD BLVD S is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WOLLARD BLVD S against other structures in Ray and across Missouri. Missouri bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WOLLARD BLVD S?

WOLLARD BLVD S in Ray, Missouri has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is WOLLARD BLVD S inspected?

WOLLARD BLVD S's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,107 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WOLLARD BLVD S is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WOLLARD BLVD S?

WOLLARD BLVD S has an NBI inventory load rating of 36.9 metric tons.

Who is responsible for maintaining WOLLARD BLVD S?

WOLLARD BLVD S is owned and maintained by State Highway Agency.

How old is WOLLARD BLVD S and does age affect safety?

WOLLARD BLVD S was built in 1994, making it 32 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.