FHWA NBI 2024 Inspection record Public-domain dataset

RP IS70W TO TUCKER

Carrying RP IS70W TO TUCKER over IS 44

S 14 T 45 N R 7 E, St. Louis city, Missouri

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
39 t Inventory load rating Higher than 67% of rated Missouri bridges

RP IS70W TO TUCKER in St. Louis city, Missouri sits above 67% of rated Missouri bridges on inventory load rating (39 t), while its 2013 build year is earlier than 13% of St. Louis city's recorded-year cohort (240 bridges).

RP IS70W TO TUCKER in St. Louis city, Missouri is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2013, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure MO:33657

POST-2000 · PRESTRESS · MULTI-SPAN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 2 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: RP IS70W TO TUCKER

The RP IS70W TO TUCKER bridge in St. Louis city, Missouri carries RP IS70W TO TUCKER over IS 44. It was built in 2013, making it 13 years old today. The structure is built primarily of prestressed concrete continuous and spans 2 sections, stretching 72.2 meters (237 feet) end to end. Daily traffic averages 3,228 vehicles, placing it in the moderately-trafficked tier of Missouri bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How RP IS70W TO TUCKER compares

▲ 5.0
Load rating vs Missouri average (33.7 t; 24,616 of 24,618 rated)
240
Bridges in St. Louis city · 24 in Poor condition

Age against the county: built in 2013, earlier than 30 of St. Louis city's 240 bridges with a recorded construction year (13%), against a county median build year of 1980. This is one of the newer structures in its county.

RP IS70W TO TUCKER 38.7 t
Missouri average (24,616 of 24,618 rated) 33.7 t

Live comparison across Missouri bridges with a recorded inventory load rating (24,616 of 24,618 rated).

RP IS70W TO TUCKER vs every rated Missouri bridge

Inventory load rating (metric tons), FHWA NBI, this state

39 Top 33% higher than 67% of 24,616 bridges

rated Missouri bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
38.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

St. Louis city inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 240 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2013
Material
Prestressed Concrete Continuous
Number of Spans
2
Structure Length
72.2 m (237 ft)
Deck Width
12.4 m (41 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,228 vehicles/day
Structure Number
33657

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether RP IS70W TO TUCKER is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RP IS70W TO TUCKER against other structures in St. Louis city and across Missouri. Missouri bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RP IS70W TO TUCKER?

RP IS70W TO TUCKER in St. Louis city, Missouri has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is RP IS70W TO TUCKER inspected?

RP IS70W TO TUCKER's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,228 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RP IS70W TO TUCKER is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RP IS70W TO TUCKER?

RP IS70W TO TUCKER has an NBI inventory load rating of 38.7 metric tons.

Who is responsible for maintaining RP IS70W TO TUCKER?

RP IS70W TO TUCKER is owned and maintained by State Highway Agency.

How old is RP IS70W TO TUCKER and does age affect safety?

RP IS70W TO TUCKER was built in 2013, making it 13 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.