FHWA NBI 2024 Inspection record Public-domain dataset

DALLAS-BROWNLEE RD

Carrying DALLAS-BROWNLEE RD over PINEY CREEK

SEC 1 T 9N R10W B, Jones, Mississippi

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
22 t Inventory load rating Lower than 84% of rated Mississippi bridges

DALLAS-BROWNLEE RD in Jones, Mississippi sits above 16% of rated Mississippi bridges on inventory load rating (22 t), while its 1979 build year is earlier than 50% of Jones's recorded-year cohort (329 bridges).

DALLAS-BROWNLEE RD in Jones, Mississippi is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1979, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure MS:SA3400000000156

INTERSTATE-ERA · CONCRETE · MULTI-SPAN · SUB-LED · LOCAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • MULTI-SPAN 2 spans
  • SUB-LED Substructure-led
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: DALLAS-BROWNLEE RD

The DALLAS-BROWNLEE RD bridge in Jones, Mississippi carries DALLAS-BROWNLEE RD over PINEY CREEK. It was built in 1979, making it 47 years old today. The structure is built primarily of concrete and spans 2 sections, stretching 11.6 meters (38 feet) end to end. Daily traffic averages 60 vehicles, placing it in the lower-traffic tier of Mississippi bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How DALLAS-BROWNLEE RD compares

▼ 11.3
Load rating vs Mississippi average (33.6 t; 16,739 rated)
329
Bridges in Jones · 25 in Poor condition

Age against the county: built in 1979, earlier than 164 of Jones's 329 bridges with a recorded construction year (50%), against a county median build year of 1979.

DALLAS-BROWNLEE RD 22.3 t
Mississippi average (16,739 rated) 33.6 t

Live comparison across Mississippi bridges with a recorded inventory load rating (16,739 rated).

DALLAS-BROWNLEE RD vs every rated Mississippi bridge

Inventory load rating (metric tons), FHWA NBI, this state

22 Top 84% higher than 16% of 16,739 bridges

rated Mississippi bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
22.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Jones inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 329 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1979
Material
Concrete
Number of Spans
2
Structure Length
11.6 m (38 ft)
Deck Width
7.6 m (25 ft)
Owner
County Highway Agency
Avg Daily Traffic
60 vehicles/day
Structure Number
SA3400000000156

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether DALLAS-BROWNLEE RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare DALLAS-BROWNLEE RD against other structures in Jones and across Mississippi. Mississippi bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for DALLAS-BROWNLEE RD?

DALLAS-BROWNLEE RD in Jones, Mississippi has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is DALLAS-BROWNLEE RD inspected?

DALLAS-BROWNLEE RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 60 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. DALLAS-BROWNLEE RD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for DALLAS-BROWNLEE RD?

DALLAS-BROWNLEE RD has an NBI inventory load rating of 22.3 metric tons.

Who is responsible for maintaining DALLAS-BROWNLEE RD?

DALLAS-BROWNLEE RD is owned and maintained by County Highway Agency.

How old is DALLAS-BROWNLEE RD and does age affect safety?

DALLAS-BROWNLEE RD was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.