COUNTY ROAD 752
Carrying COUNTY ROAD 752 over NORTH PLUM CREEK
2E 2N FARNAM, Dawson, Nebraska
Inventory: FHWA NBI 2024 · last ETL August 2026
FHWA NBI record, refreshed with each annual release.
COUNTY ROAD 752 in Dawson, Nebraska sits above 61% of rated Nebraska bridges on inventory load rating (33 t), while its 2022 build year is earlier than 1% of Dawson's recorded-year cohort (300 bridges).
COUNTY ROAD 752 in Dawson, Nebraska is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2022, it carries 1 rated component on the inspecting agency's 0-9 scale, and its weakest reported component scores 9. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.
NBI record plate
Structure NE:C002404605
POST-2000 · STEEL · MULTI-SPAN · CULVERT-LED · TRACE-ADT · STANDARD-LOAD · CAT-GOOD
- POST-2000 2000+
- STEEL Steel
- MULTI-SPAN 3 spans
- CULVERT-LED Culvert-led
- TRACE-ADT Trace ADT
- STANDARD-LOAD Standard load
- CAT-GOOD Good
Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.
Bridge Snapshot: COUNTY ROAD 752
The COUNTY ROAD 752 bridge in Dawson, Nebraska carries COUNTY ROAD 752 over NORTH PLUM CREEK. It was built in 2022, making it 4 years old today. The structure is built primarily of steel and spans 3 sections, stretching 10.4 meters (34 feet) end to end. Daily traffic averages 5 vehicles, placing it in the lower-traffic tier of Nebraska bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show culvert at 9/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.
How COUNTY ROAD 752 compares
Age against the county: built in 2022, earlier than 2 of Dawson's 300 bridges with a recorded construction year (1%), against a county median build year of 1976. This is one of the newer structures in its county.
Live comparison across Nebraska bridges with a recorded inventory load rating (15,392 of 15,398 rated).
COUNTY ROAD 752 vs every rated Nebraska bridge
Inventory load rating (metric tons), FHWA NBI, this state
33 Top 39% higher than 61% of 15,392 bridges
rated Nebraska bridges, bucketed by value
Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.
Source FHWA National Bridge Inventory · August 2026
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Dawson inventory by recorded NBI category
Exclusive Good/Fair/Poor bands across all 300 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.
Structural Details
- Year Built
- 2022
- Material
- Steel
- Number of Spans
- 3
- Structure Length
- 10.4 m (34 ft) 0
- Owner
- County Highway Agency
- Avg Daily Traffic
- 5 vehicles/day
- Structure Number
- C002404605
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether COUNTY ROAD 752 is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare COUNTY ROAD 752 against other structures in Dawson and across Nebraska. Nebraska bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for COUNTY ROAD 752?
COUNTY ROAD 752 in Dawson, Nebraska on the FHWA's 0–9 scale.
How often is COUNTY ROAD 752 inspected?
COUNTY ROAD 752's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. COUNTY ROAD 752 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for COUNTY ROAD 752?
COUNTY ROAD 752 has an NBI inventory load rating of 33.0 metric tons.
Who is responsible for maintaining COUNTY ROAD 752?
COUNTY ROAD 752 is owned and maintained by County Highway Agency.
How old is COUNTY ROAD 752 and does age affect safety?
COUNTY ROAD 752 was built in 2022, making it 4 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Share this inspection record
Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.
Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.